The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The development hereby permitted shall be implemented in accordance with the following plans numbered: Location Plan, 10058_1 Rev C (dated 13.4.26) and 10058_2 Rev C (dated 13.4.26). Reason: For the avoidance of doubt and in the interests of proper planning.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those listed in the 'Materials' section of the application form, with the tile finish on the cheeks of the dormer to match the existing roof tiles as closely as possible in colour. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-work
Note to Applicant: In accordance with Local Plan policy DM11 and NPPF paragraphs 187d and 192b, biodiversity enhancements are recommended on site in the form of a bat box or a bird box. Further information is available at: https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes
Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.