Council planning record

Roof alterations with new dormer.

40 SHAFTESBURY AVENUE, CHANDLER'S FORD, EASTLEIGH, SO53 3BS

Decided PermitReference: H/26/101107Eastleigh Borough Council

Application location

40 SHAFTESBURY AVENUE, CHANDLER'S FORD, EASTLEIGH, SO53 3BS

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
18 Mar 2026
Validated
31 Mar 2026
Determination deadline
26 May 2026
Local authority
Eastleigh Borough Council

Application overview

Roof alterations with new dormer.

Proposal details

Reference
H/26/101107
Ward
Chandler's Ford Ward
Parish
Chandler's Ford CP
Agent
Bernard E Cole & Partners (Guy Leffers-Smith)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
H_26_101107 PL_Final DecisionDecision · PDF26 May 2026View
H_26_101107 Decision notice informative leaflet - PERMITDecision · PDF26 May 2026View
H_26_101107 Delegated Officer ReportOfficer Report · PDF22 May 2026View
Existing Elevations, Floor Plan and SectionsPlans · PDF13 Apr 2026View
Proposed Elevations, Floor, Section and Block PlansPlans · PDF13 Apr 2026View
Ecology response for H 26 101107 40 SHAFTESBURY AVENUE, CHANDLER'S FORDConsultee Response · PDF1 Apr 2026View
Application Form_RedactedApplication Form · PDF30 Mar 2026View
Biodiversity ChecklistSupporting Documents · PDF18 Mar 2026View
Location PlanLocation Plan · PDF18 Mar 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_26_101107 PL_Final Decision H_26_101107 Decision notice informative leaflet - PERMIT
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: Location Plan, 10058_1 Rev C (dated 13.4.26) and 10058_2 Rev C (dated 13.4.26). Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those listed in the 'Materials' section of the application form, with the tile finish on the cheeks of the dormer to match the existing roof tiles as closely as possible in colour. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-work
  5. Note to Applicant: In accordance with Local Plan policy DM11 and NPPF paragraphs 187d and 192b, biodiversity enhancements are recommended on site in the form of a bat box or a bird box. Further information is available at: https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes
  6. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.