Council planning record

Single storey rear/side extension, garage conversion and pitched roofs to existing dormers

5 FOREST ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 1NA

Decided PermitReference: H/26/101063Eastleigh Borough Council

Application location

5 FOREST ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 1NA

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
11 Mar 2026
Validated
24 Mar 2026
Determination deadline
19 May 2026
Local authority
Eastleigh Borough Council

Application overview

Single storey rear/side extension, garage conversion and pitched roofs to existing dormers

Proposal details

Reference
H/26/101063
Alternative references
14770151
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP
Agent
CMC Design Architectural Services (Mr Chris McDermott)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
H_26_101063 PL_Final DecisionDecision Notice · PDF19 May 2026View
Officer ReportOfficer Report · PDF19 May 2026View
Ecology response 18 5 26 for H 26 101063 5 FOREST ROAD, CHANDLER'S FORDConsultee Response · PDF18 May 2026View
5 Forest Road PRA 15052026Supporting Documents · PDF15 May 2026View
Ecology response for H 26 101063 5 FOREST ROAD, CHANDLER'S FORDConsultee Response · PDF28 Mar 2026View
101063 - 5 FOREST ROAD, CHANDLER'S FORDConsultee Response · PDF26 Mar 2026View
Location and Site Plans · PDF24 Mar 2026View
Ground Floor and Roof Plans - ExistingFloor Plan · PDF11 Mar 2026View
Ground Floor and Roof Plans - ProposedFloor Plan · PDF11 Mar 2026View
Application Form REDACTEDApplication Form · PDF11 Mar 2026View
Elevation Plans - ProposedElevations Plan · PDF11 Mar 2026View
Elevation Plans - ExistingElevations Plan · PDF11 Mar 2026View
Arboricultural Impact Assessment REDACTEDSupporting Documents · PDF11 Mar 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_26_101063 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 1040/02/100, 1040/02/101, 1040/02/102, 1040/02/103, 1040/02/104 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture to those listed in the Materials Section of the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. The development must accord with the arboricultural report reference TH 5816. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason - To retain and protect the existing trees which form an important part of the amenity of the locality.
  5. Note to applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im working-on-a-building-with-bats/ive-found-a-bat-during-works.
  6. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.