Council planning record

Construction of single storey rear and side extension; and construction of detached garage

36 STIRLING CRESCENT, HEDGE END, SOUTHAMPTON, SO30 2SB

Decided PermitReference: H/25/99989Eastleigh Borough Council

Last published check: 13 Oct 2026, 18:17. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
28 Aug 2025
Validated
11 Sept 2025
Determination deadline
19 Feb 2026
Local authority
Eastleigh Borough Council

Application overview

Construction of single storey rear and side extension; and construction of detached garage

Proposal details

Reference
H/25/99989
Alternative references
14287437
Ward
Hedge End North Ward
Parish
Hedge End CP
Agent
Applecore PDM (Oliver Farr)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

36 STIRLING CRESCENT, HEDGE END, SOUTHAMPTON, SO30 2SB

This record has no verified map location.

Documents 20 of 20

DocumentPublishedAction
H_25_99989 PL_Final DecisionDecision Notice · PDF13 Feb 2026View
H_25_99989 Delegated Officer ReportOfficer Report · PDF12 Feb 2026View
Tree Officer response (Update 27.01.2025)Consultee Response · PDF27 Jan 2026View
Hedge End Town Council responseParish Response · PDF23 Jan 2026View
Southern Water GIS MapConsultee Response · PDF15 Jan 2026View
Southern Water responseConsultee Response · PDF15 Jan 2026View
Ground Screws SectionSection Plan · PDF12 Jan 2026View
Stirling Crescent Foundations - RedactedSupporting Documents · PDF12 Jan 2026View
AMENDED Proposed Elevations and Roof PlanElevations Plan · PDF28 Nov 2025View
AMENDED Proposed Floor PlansFloor Plan · PDF28 Nov 2025View
AMENDED Site and Location PlanLocation Plan · PDF28 Nov 2025View
Hedge End Town Council responseParish Response · PDF9 Oct 2025View
Tree Officer responseConsultee Response · PDF6 Oct 2025View
SWS consultation response letterConsultation Response · PDF16 Sept 2025View
SWS -GIS mapConsultation Response · PDF16 Sept 2025View
Application Form RedactedApplication Form · PDF28 Aug 2025View
Design and Access statementDesign And Access Statement · PDF28 Aug 2025View
Existing Floor Plans and ElevationsElevations And Floor Plan · PDF28 Aug 2025View
Tree SurveyTree Info · PDF28 Aug 2025View
Tree Protection PlanTree Info · PDF28 Aug 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_25_99989 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: PG.1058-25-01, PG.1058-25-02 rev I, PG.1058-25-03 rev I and PG.1058-25-04 rev D. Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in the 'Materials' section of the Application Form and those listed on the approved plan numbered "PG.1058-25-03 rev I" (AMENDED Proposed Elevations). Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. The development must accord with the arboricultural report reference “AIA/AMS-KC/37STIRLING/001”, and details of the foundation design and installation as described in “25-1749 36 Stirling Crescent Foundations” and “25-1749 PL01”. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan TPP reference “KC/36STIRLING/001”. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  5. Notwithstanding the information submitted to date, no excavation, demolition or development related works shall take place on site until an arboricultural monitoring statement proposal has been submitted and approved by the LPA. The approved arboricultural monitoring statement proposal must detail supervision activity of the foundation installation and method of reporting to the LPA. The approved monitoring statement may only be modified subject to written agreement from the LPA. This condition may only be fully discharged upon completion of the proposed development, subject to submission of monitoring reports detailed within the monitoring statement. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  6. The annexe hereby permitted shall only be used in conjunction with the existing dwelling or by a relative of the occupiers of the existing dwelling and shall not be sold off, occupied or used as an independent unit of accommodation, or as a holiday let. Reason: The property is only suitable as a single residential unit.
  7. Note to Applicant: Please see the extract provided by Southern Water (dated 15/01/2026) showing the approximate position of our existing sewer and water main assets crossing/in the vicinity of the development site. The exact position of the public assets must be determined on site by the applicant in consultation with Southern Water before the layout of the proposed development is finalised. To get in contact to confirm the exact position of the asset please visit: https://www.southernwater.co.uk/media/ph4fk3pe/ds-location-of-rising-mains_pb.pdf. For information on required stand-off distances from public sewers please refer to: https://www.southernwater.co.uk/media/st5orjvm/stand-off-distances.pdf. For further advice, please contact Southern Water, Southern House, Yeoman Road, Worthing, West Sussex, BN13 3NX (Tel: 0330 303 0119); website: southernwater.co.uk or by email at: SouthernWaterPlanning@southernwater.co.uk
  8. Note to Applicant: Please note that any residential, business or commercial use of the garage hereby approved for purposes not incidental to, or ancillary to the main dwelling may require separate planning consent to be obtained.
  9. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.