The development hereby permitted shall be implemented in accordance with the following plans numbered: 739/02/106 Rev B, 739/02/100 Rev B, 739/02/102, 739/02/105 Rev B, 739/02/103, 739/02/01, and 739/02/104 Rev B. Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building or shall otherwise accord with the details shown on the approved plan numbered: 739/02/106 Rev B. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
Prior to the first occupation of the extensions hereby permitted, a minimum of one bat box and one swift box shall be installed on the dwelling, positioned in accordance with best practice guidance (e.g. bat boxes at least 4m above ground level, away from artificial lighting, and swift boxes under eaves at least 5m above ground level with clear flight paths). The boxes shall thereafter be retained for the lifetime of the development. Reason: To protect and enhance biodiversity.
Note to Applicant: To safeguard wildlife, the development must proceed in accordance with the following precautionary working method: All building materials to be stored on hard standing or on pallets, as far as possible from hedgerows, scrub or potential habitat.Any excavations must be covered at night or be fitted with a small animal escape ramp.No fires can be lit on site.Waste must be stored in a skip and not be allowed to accumulate in piles which could be used by wildlife. Any chemicals and fuels must be stored carefully and away from potential wildlife habitat.Any animals found on site should not be handled but be allowed to move away to a place of safety on their own.
Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works
Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.