Council planning record

First floor extension to east side elevation, to include raised ridge height and alterations to fenestration to rear and east side elevations.

BRIDGE HOUSE, 56 MISSENDEN ACRES, HEDGE END, SOUTHAMPTON, SO30 2RE

Decided PermitReference: H/25/99642Eastleigh Borough Council

Last published check: 21 Sept 2026, 23:33. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
30 Jun 2025
Validated
7 Jul 2025
Determination deadline
1 Sept 2025
Local authority
Eastleigh Borough Council

Application overview

First floor extension to east side elevation, to include raised ridge height and alterations to fenestration to rear and east side elevations.

Proposal details

Reference
H/25/99642
Alternative references
14135752
Ward
Hedge End North Ward
Parish
Hedge End CP
Agent
Cloud 9 Architecture (Paul Spratt)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

BRIDGE HOUSE, 56 MISSENDEN ACRES, HEDGE END, SOUTHAMPTON, SO30 2RE

This record has no verified map location.

Documents 15 of 15

DocumentPublishedAction
AMENDED Proposed Elevation PlansElevations Plan · PDF15 Aug 2025View
AMENDED Proposed Floor PlansPlans · PDF15 Aug 2025View
H_25_99642 PL_Final DecisionDecision Notice · PDF15 Aug 2025View
H_25_99642 Decision notice informative leaflet - PERMITDecision · PDF15 Aug 2025View
H_25_99642 Delegated Officer ReportOfficer Report · PDF14 Aug 2025View
Ecology Consultee ResponseConsultee Response · PDF30 Jul 2025View
Parish Consultation ResponseConsultation Response · PDF18 Jul 2025View
Ecology Consultation ResponseConsultee Response · PDF15 Jul 2025View
Tree Consultee ReportConsultee Response · PDF14 Jul 2025View
AMENDED Location and Site PlansLocation Plan · PDF3 Jul 2025View
Existing Floor and Roof PlansFloor Plan · PDF30 Jun 2025View
SUPERSEDED Proposed Floor and Roof PlansElevations And Floor Plan · PDF30 Jun 2025View
Application Form RedactedApplication Form · PDF30 Jun 2025View
SUPERSEDED Proposed ElevationsElevations Plan · PDF30 Jun 2025View
Existing ElevationsElevations Plan · PDF30 Jun 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_25_99642 PL_Final Decision H_25_99642 Decision notice informative leaflet - PERMIT
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: C9_MA_PL_100_A, C9_MA_PL_103_A, C9_MA_PL_101, C9_MA_PL_102, C9_MA_PL_104_B Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  5. No development shall start on site until a Construction Environmental Management Plan has been submitted to and approved in writing by the Planning Authority, which shall include: (a) Precautionary working methods to avoid any pollution of the watercourse during construction; (b) Plan to show where materials and equipment will be kept on-site; Demolition and construction work shall only take place in accordance with the approved method statement. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016 – 2036).
  6. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.