The development hereby permitted shall be implemented in accordance with the following plans numbered: P-03 Rev C, P-01 Rev C, P-04 Rev C, P-02 Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building Reason: To ensure a satisfactory visual relationship between the new development and the existing.
The annexe hereby permitted shall only be used in conjunction with the existing dwelling or by a dependent relative of the occupiers of the existing dwelling and shall not be sold off, occupied or used as an independent unit of accommodation. Reason: The property is not suitable for sub-division into two separate dwellings.
The development hereby permitted shall not be occupied until a landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping including trees and boundary treatment and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (Dec 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im[1]working-on-a-building-with-bats/ive-found-a-bat-during-works.
Note to Applicant: If nesting birds are present on site, within vegetation or bird boxes, these can only be removed when it is clear that they are not in use by nesting birds, as disturbance to nesting birds is illegal under the Wildlife and Countryside Act. Bird nesting season is usually from the end of February to the end of August, however some birds can still nest outside of these times.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.