Council planning record

Single storey front/side extension. Single storey side extension following demolition of existing garage. Single storey rear extension. Extended dropped kerb. Front canopy (Amended description)

13 GRANADA ROAD, HEDGE END, SOUTHAMPTON, SO30 4AL

Decided PermitReference: H/25/99458Eastleigh Borough Council

Last published check: 22 Sept 2026, 02:43. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
27 May 2025
Validated
27 May 2025
Determination deadline
12 Aug 2025
Local authority
Eastleigh Borough Council

Application overview

Single storey front/side extension. Single storey side extension following demolition of existing garage. Single storey rear extension. Extended dropped kerb. Front canopy (Amended description)

Proposal details

Reference
H/25/99458
Alternative references
14050078 manual
Ward
Hedge End South Ward
Parish
Hedge End CP
Agent
MDT Design (Mr Matthew Tate)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

13 GRANADA ROAD, HEDGE END, SOUTHAMPTON, SO30 4AL

This record has no verified map location.

Documents 8 of 8

DocumentPublishedAction
Construction Management Plan - 13 Granada RoadSupporting Documents · PDF12 Aug 2025View
H_25_99458 PL_Final DecisionDecision Notice · PDF12 Aug 2025View
H_25_99458 Delegated Officer ReportOfficer Report · PDF12 Aug 2025View
H_25_99458 Decision notice informative leaflet - PERMITDecision · PDF12 Aug 2025View
Amended Proposed Elevations, Floor and Roof PlansPlans · PDF4 Aug 2025View
Amended Existing Location, Site Layout, Elevations, Floor and Roof PlansPlans · PDF11 Jul 2025View
Application Form RedactedApplication Form · PDF27 May 2025View
SUPERSEDED Proposed Elevations and Floor PlansPlans · PDF27 May 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_25_99458 PL_Final Decision H_25_99458 Decision notice informative leaflet - PERMIT
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 01_B and 02_H. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended), no development within Class A or Class B of Part 1, Schedule 2 of the Order (relating to extensions, alterations, and additions to the roof) shall be carried out without the prior written consent of the Local Planning Authority. Reason: To protect the amenities of the locality and to maintain a good quality environment.
  5. The development shall be carried out in full accordance with the submitted Construction Management Plan dated 07/08/2025, unless otherwise agreed in writing by the Local Planning Authority. Reason: To limit the impact the development has on the amenity of the locality.
  6. Note to Applicant: The following measures, taken from the submitted Construction Management Plan (dated 07/08/2025), are noted for ease of reference: Working hours: 08:00–17:00 Monday to Friday, 09:00–13:00 on Saturdays, with no works on Sundays or Bank Holidays.No contractor parking on public pavements.Parking for operatives and visitors to be within the site wherever possible; otherwise, to be parked away from the site to avoid congestion.Delivery and construction vehicles to be escorted on and off site, with use of smaller vehicles where possible.No noisy works outside of core working hours.Radio volume to be kept to a minimum.Dust suppression methods to be used (e.g. water sprays, sheeting).All machinery and tools to be maintained in good order.Waste to be segregated and stored in skips within the site boundary; no waste burning on site.Materials and plant to be stored securely within the site boundary. This summary is provided for information and reflects the construction management commitments made by the applicant.
  7. Note to Applicant: The development must be carried out in accordance with the following precautionary working methods to avoid harm to wildlife that could be using the site: All building materials to be stored on hardstanding or on pallets, as far as possible from hedgerows, scrub, or potential habitat.Any excavations must be covered at night or be fitted with a small animal escape ramp.No fires to be lit on site.Waste must be stored in a skip and not be allowed to accumulate in piles which could be used by wildlife.Any chemicals and fuels must be stored carefully and away from potential wildlife habitat.Any animals found on site must not be handled but allowed to move away to a place of safety on their own.
  8. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works
  9. Note to Applicant: The applicant is encouraged to install a bat box and a swift nest box in accordance with the Council Ecologist’s advice, positioned on suitable elevations to maximise their effectiveness. Guidance on placement is available from the Bat Conservation Trust and Swift Conservation.
  10. Note to Applicant: The applicant is advised that the extension of the dropped kerb will require a licence from Hampshire County Council as the Local Highway Authority before works commence within the public highway.
  11. Note to Applicant: The Local Planning Authority acknowledges that a number of neighbour concerns were raised during the course of the application. While not all matters fall within the scope of planning conditions, the applicant has voluntarily agreed to implement certain measures in response. These commitments are not secured through formal condition but are noted here to reflect the applicant’s stated intentions and the constructive engagement that has taken place between the parties.
  12. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  13. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.