Council planning record

Front extension. Conversion of attached garage and utility room to an annexe. Extension of dropped kerb.

25 DENZIL AVENUE, NETLEY ABBEY, SOUTHAMPTON, SO31 5AZ

Decided PermitReference: H/25/99407Eastleigh Borough Council

Last published check: 22 Sept 2026, 01:38. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
20 May 2025
Validated
3 Jun 2025
Determination deadline
29 Jul 2025
Local authority
Eastleigh Borough Council

Application overview

Front extension. Conversion of attached garage and utility room to an annexe. Extension of dropped kerb.

Proposal details

Reference
H/25/99407
Alternative references
13921378 manual
Ward
Hamble & Netley Ward
Parish
Hound CP
Agent
AC Design (Mr Alex Carr)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

25 DENZIL AVENUE, NETLEY ABBEY, SOUTHAMPTON, SO31 5AZ

This record has no verified map location.

Documents 14 of 14

DocumentPublishedAction
H_25_99407 PL_Final DecisionDecision Notice · PDF29 Jul 2025View
AMENDED Proposed Elevations, Floor and Roof PlanElevations And Floor Plan · PDF29 Jul 2025View
H_25_99407 Decision notice informative leaflet - PERMITDecision · PDF29 Jul 2025View
AMENDED Proposed Site LayoutSite Layout Plan · PDF29 Jul 2025View
H_25_99407 Delegated Officer ReportOfficer Report · PDF29 Jul 2025View
Ecology responseConsultee Response · PDF17 Jun 2025View
Hampshire Highways responseConsultee Response · PDF16 Jun 2025View
SUPERSEDED Proposed Site Layout PlanSite Layout Plan · PDF3 Jun 2025View
Existing Site Layout PlanSite Layout Plan · PDF3 Jun 2025View
SUPERSEDED Confirmation of Existing BedroomsSupporting Documents · PDF2 Jun 2025View
Existing Street Scene PlanStreet Scene Plan · PDF2 Jun 2025View
Location PlanLocation Plan · PDF20 May 2025View
Application Form RedactedApplication Form · PDF20 May 2025View
Existing Floor Plans and ElevationsElevations And Floor Plan · PDF20 May 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_25_99407 PL_Final Decision H_25_99407 Decision notice informative leaflet - PERMIT
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: NBY01-900-1st, NBY01-1000-1st, NBY01-1001-B, NBY-100-1st, NBY-102-1st and NBY-101-B. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. The development hereby permitted shall not be brought into use until the works to the access, including the footway and/or verge crossing, has been constructed and the parking area has been provided in accordance with the approved site layout plan (dwg no. 'NBY01-1001-B') and is thereafter retained. Reason: To provide satisfactory access and parking in the interests of highway safety.
  5. The annexe hereby permitted shall only be used in conjunction with the existing dwelling or by a dependent relative of the occupiers of the existing dwelling and shall not be sold off, occupied or used as an independent unit of accommodation. Reason: The property is not suitable for sub-division into two separate dwellings.
  6. An internal connection between the existing dwelling and the annexe must be retained at all times. Reason: The property is not suitable for sub-division into two separate dwellings.
  7. Note to Applicant: Separate permission is required from Hampshire Country Council as Local Highway Authority to undertake the drop kerb works. Details of this process can be found via the following web address: https://www.hants.gov.uk/transport/parking/droppedkerbs
  8. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  9. Note to Applicant: Biodiversity enhancements are required in accordance with Local Plan policy DM 11 and NPPF paragraphs 187d and 192 b, and are recommended to be placed on the main building in the form of a bat box and swift nest box. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight.
  10. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.