Council planning record

Single storey pitched roof side extension.

4 LADYWOOD, EASTLEIGH, SO50 4RW

Decided PermitReference: H/25/99306Eastleigh Borough Council

Last published check: 22 Sept 2026, 04:27. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
30 Apr 2025
Validated
30 Apr 2025
Determination deadline
25 Jun 2025
Local authority
Eastleigh Borough Council

Application overview

Single storey pitched roof side extension.

Proposal details

Reference
H/25/99306
Alternative references
PP-13983455v1 Manual DL
Ward
Eastleigh North Ward
Parish
Boyatt Wood CP
Agent
White & Gray Architecture (Mr Steven White)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

4 LADYWOOD, EASTLEIGH, SO50 4RW

This record has no verified map location.

Documents 7 of 7

DocumentPublishedAction
Final Decision PDFDecision Notice · PDF25 Jun 2025View
H_25_99306 Delegated Officer ReportOfficer Report · PDF24 Jun 2025View
Tree Officer responseConsultee Response · PDF20 May 2025View
Application Form RedactedApplication Form · PDF30 Apr 2025View
Existing Site Plan, Floor & Roof Plans and ElevationsPlans · PDF30 Apr 2025View
Proposed Site Plan, Floor & Roof Plans and ElevationsPlans · PDF30 Apr 2025View
Location PlanLocation Plan · PDF30 Apr 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
Final Decision PDF
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: WG236 100-01 P01, WG236 100-02 P01 and WG236 100-03 P01. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. No excavation, demolition or development related works shall take place on site until a scaled and referenced tree protection plan, as per British Standard 5837:2012 (Trees in Relation to Design, Demolition and Construction – Recommendations), is submitted and approved by the LPA. The approved tree protection plan must be adhered to in full, and may only be modified subject to written agreement from the LPA. Reason: to retain and protect the existing trees which form an important part of the amenity of the locality.
  5. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.