Council planning record

Removal of conservatory and erection of single storey side extension

HAMMERLEY FARM HOUSE, HAMMERLEY ROAD, HORTON HEATH, EASTLEIGH, SO50 7HQ

Decided PermitReference: H/25/99227Eastleigh Borough Council

Last published check: 22 Sept 2026, 05:24. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
11 Apr 2025
Validated
11 Apr 2025
Determination deadline
6 Jun 2025
Local authority
Eastleigh Borough Council

Application overview

Removal of conservatory and erection of single storey side extension

Proposal details

Reference
H/25/99227
Alternative references
13939997 manual download
Ward
Fair Oak & Horton Heath Ward
Parish
Fair Oak and Horton Heath CP
Agent
Mr Neil Stantiall

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

HAMMERLEY FARM HOUSE, HAMMERLEY ROAD, HORTON HEATH, EASTLEIGH, SO50 7HQ

This record has no verified map location.

Documents 6 of 6

DocumentPublishedAction
H_25_99227 PL_Final DecisionDecision Notice · PDF29 May 2025View
H_25_99227 Delegated Officer ReportOfficer Report · PDF29 May 2025View
Parish Consultation ResponseConsultation Response · PDF7 May 2025View
Heritage Consultation ResponseConsultation Response25 Apr 2025View
Application Form RedactedApplication Form · PDF11 Apr 2025View
Existing and Proposed Elevations and Floor Plans & Location PlanPlans · PDF11 Apr 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_25_99227 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: 25010_001P_A Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the adjoining building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  5. NOTE TO APPLICANT: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/imworking-on-a-building-with-bats/ive-found-a-bat-during-works.
  6. NOTE TO APPLICANT: A precautionary working method should be following during construction works. It should include: All building materials to be stored on hard standing or on pallets, as far as possible from hedgerows, scrub or potential habitat.Any excavations must be covered at night or be fitted with a small animal escape rampNo fires can be lit on site.Waste must be stored in a skip and not be allowed to accumulate in piles which could be used by wildlife.Any animals found on site should not be handled but be allowed to move away to a place of safety on their own.Any vegetation to be removed to facilitate the development must be removed outside of bird nesting season (which is usually between the beginning of March and the end of August) or if this is not possible then only after being checked for nesting birds by a suitably qualified ecologist up to 24 hours before the start of works. If any active nests are found, work must stop and a 5 m buffer must be erected around the nest to protect it from disturbance until after the birds have fledged and left the nest.
  7. NOTE TO APPLICANT: Biodiversity enhancements will be required in accord with Local Plan policy DM 11 and NPPF (December 2024) paragraphs 187d and 192 b. A bat brick and a swift brick may be appropriate for this building. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm )
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.