Council planning record

Addition of New Porch

85 HIGH STREET, BOTLEY, SOUTHAMPTON, SO30 2ES

Decided PermitReference: H/25/99215Eastleigh Borough Council

Last published check: 22 Sept 2026, 04:42. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
7 Apr 2025
Validated
25 Apr 2025
Determination deadline
28 Jul 2025
Local authority
Eastleigh Borough Council

Application overview

Addition of New Porch

Proposal details

Reference
H/25/99215
Alternative references
PP-13911400v1 Manual DL
Ward
Botley Ward
Parish
Botley CP
Agent
CMC Design Architectural Services (Mr Chris McDermott)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

85 HIGH STREET, BOTLEY, SOUTHAMPTON, SO30 2ES

This record has no verified map location.

Documents 18 of 18

DocumentPublishedAction
H_25_99215 Delegated Officer ReportOfficer Report · PDF28 Jul 2025View
H_25_99215 Decision notice informative leaflet - PERMITDecision · PDF28 Jul 2025View
H_25_99215 PL_Final DecisionDecision Notice · PDF28 Jul 2025View
Parish Consultation ResponseConsultation Response · PDF26 Jun 2025View
Heritage Consultation ResponseConsultation Response · PDF16 Jun 2025View
Amended Location and Site PlansLocation Plan · PDF10 Jun 2025View
Amended Proposed Roof and Floor PlansPlans · PDF10 Jun 2025View
Amended Proposed ElevationsElevations Plan · PDF10 Jun 2025View
Parish Consultation ReponseConsultation Response · PDF28 May 2025View
Heritage Consultation ResponseConsultation Response · PDF12 May 2025View
Ecology Consultation ResponseConsultee Response · PDF12 May 2025View
SUPERSEDED Location and Block PlansPlans · PDF25 Apr 2025View
SUPERSEDED Proposed Elevations PlansElevations Plan · PDF25 Apr 2025View
Existing Elevations PlanElevations Plan · PDF22 Apr 2025View
SUPERSEDED Proposed Ground Floor and Roof PlansPlans · PDF7 Apr 2025View
Application Form RedactedApplication Form · PDF7 Apr 2025View
Planning StatementPlanning Statement · PDF7 Apr 2025View
Existing Ground Floor and Roof PlansPlans · PDF7 Apr 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_25_99215 Decision notice informative leaflet - PERMIT H_25_99215 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: 960/03/104 RevA, 960/03/100 RevA, 960/03/102, 960/03/103 RevA and 960/03/101 Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  5. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  6. Note to Applicant: If a hedgehog is found during development and/or there are welfare concerns, the British Hedgehog Preservation Society can be contacted for advice and guidance on 01584 890 801 or on the website at https://www.britishhedgehogs.org.uk/found-a-hedgehog/. If hedgehogs are using the site they would be sheltering under dense vegetation or within long grass, dead leaves or piles of dead wood. These areas should be cleared by hand, not using a digger, to allow animals time to escape. Removal of potential habitat must not take place from November through March when animals may be hibernating. No fires can be lit on site. The British Hedgehog Society recommends that Areas should be cleared on rotation with scrubby patches left to provide nesting habitat and cover. If this is not possible, piles of dead wood and brash piles can be created in other areas around the site to mitigate for the removal of suitable nesting sites. These can be created behind hedges or out of the way for smaller developments with limited space. Replacement habitat can include log piles, leaf litter, dead wood and scrub. Hedgehog houses can also be made or purchased. https://www.hedgehogstreet.org/help-hedgehogs/hedgehog-homes/ Hedgehog holes (13 x 13 cm minimum) must be included in the baseboards of any closed board fences to allow the free passage of small mammals through the garden
  7. Note to Applicant: Biodiversity enhancements will be required in accord with Local Plan policy DM 11 and NPPF (December 2024) paragraphs 187d and 192 b. A bat box and a swift nest box may be appropriate for this building. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.wildaboutgardens.org.uk/sites/default/files/2022-03/WAG16%20Bats%20updated%202022%20WEB.pdf - Stars of the Night guide to attract bats into your garden https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm https://www.hedgehogstreet.org/help-hedgehogs/hedgehog-homes/ www.bats.org.uk/resources/guidance-for-professionals/landscape-and-urban-design-for-bats-and-biodiversity https://ptes.org/my-garden/ https://www.ukbutterflies.co.uk/foodplants.php
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.