Council planning record

Removal of existing conservatory to form side extension

33 DERBY ROAD, EASTLEIGH, SO50 5FD

Decided PermitReference: H/25/99155Eastleigh Borough Council

Last published check: 22 Sept 2026, 06:24. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
27 Mar 2025
Validated
4 Apr 2025
Determination deadline
30 May 2025
Local authority
Eastleigh Borough Council

Application overview

Removal of existing conservatory to form side extension

Proposal details

Reference
H/25/99155
Alternative references
Email App - Manual
Ward
Eastleigh South Ward
Parish
Eastleigh Town CP
Agent
MCA Mayorga Chartered Architect Ltd (Mr Jose Mayorga)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

33 DERBY ROAD, EASTLEIGH, SO50 5FD

This record has no verified map location.

Documents 7 of 7

DocumentPublishedAction
Officer ReportOfficer Report · PDF23 May 2025View
Decision NoticeDecision Notice · PDF23 May 2025View
Proposed Floor and Elevation PlansElevations And Floor Plan · PDF4 Apr 2025View
Existing Elevation and Floor PlanElevations And Floor Plan · PDF4 Apr 2025View
Block PlanBlock Plan · PDF4 Apr 2025View
Location PlanLocation Plan · PDF4 Apr 2025View
Planning Application RedactedApplication Form · PDF4 Apr 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
Decision Notice
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: MCA2025/33/ 104, MCA2025/33/ 103, MCA2025/33/ 101, MCA2025/33/ 102 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the adjoining building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  3. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  4. NOTE TO APPLICANT: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  5. NOTE TO APPLICANT: Biodiversity enhancements will be required in accord with Local Plan policy DM 11 and NPPF (December 2024) paragraphs 187d and 192 b. A bat brick and a swift brick may be appropriate for this building.
  6. NOTE TO APPLICANT: It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
  7. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.