Council planning record

Single storey side extension

1 MEADOWSWEET WAY, HORTON HEATH, EASTLEIGH, SO50 7PE

Decided PermitReference: H/25/99121Eastleigh Borough Council

Last published check: 22 Sept 2026, 07:23. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
25 Mar 2025
Validated
26 Mar 2025
Determination deadline
21 May 2025
Local authority
Eastleigh Borough Council

Application overview

Single storey side extension

Proposal details

Reference
H/25/99121
Alternative references
PP-13877673v1 Manual DL
Ward
Fair Oak & Horton Heath Ward
Parish
Fair Oak and Horton Heath CP
Agent
David Windsor (Mr David Windsor)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

1 MEADOWSWEET WAY, HORTON HEATH, EASTLEIGH, SO50 7PE

This record has no verified map location.

Documents 8 of 8

DocumentPublishedAction
H_25_99121 Decision notice informative leaflet - PERMITDecision · PDF19 May 2025View
H_25_99121 PL_Final DecisionDecision Notice · PDF19 May 2025View
H_25_99121 Delegated Officer ReportOfficer Report · PDF19 May 2025View
Parish responseParish Response · PDF23 Apr 2025View
Ecology response for H 25 99121 1 MEADOWSWEET WAY, HORTON HEATHConsultee Response · PDF21 Apr 2025View
Existing & Proposed Elevations, Floor Plan, Roof Plan, Section and Site PlanPlans · PDF26 Mar 2025View
Location PlanLocation Plan · PDF26 Mar 2025View
Application Form RedactedApplication Form · PDF26 Mar 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_25_99121 Decision notice informative leaflet - PERMIT H_25_99121 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: Location Plan and M.S.01. rev A Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in the 'Materials' section of the application form and in the approved plan numbered 'M.S.01. rev A'. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. Note to Applicant: No vehicles (including builder’s and contractor’s), machinery, equipment, materials, spoil, scaffolding, or anything else associated with the works, use, or occupation of the development, shall be left on or near to a Public Right of Way as to cause obstruction, hindrance, or a hazard to the legitimate users. The public retain the right to use the PROW at all times.
  5. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  6. Note to Applicant: Precautionary working methods to protect hedgehogs and nesting birds shall be followed during construction of the proposal hereby approved. This shall include: All building materials are to be stored on hard standing or on pallets, as far as possible from hedgerows, scrub or potential habitat; any excavations shall be covered at night or be fitted with a small animal escape ramp; No fires shall be lit on site; Waste shall be stored in a skip and not be allowed to accumulate in piles which could be used by wildlife; Any animals found on site shall not be handled but be allowed to move away to a place of safety on their own; Any vegetation to be removed to facilitate the development must be removed outside of bird nesting season (which is between the beginning of March and the end of August) or if this is not possible then only after being checked for nesting birds by a suitably qualified ecologist up to 24 hours before the start of works. If any active nests are found, work must stop and a 5 m buffer must be erected around the nest to protect it from disturbance until after the birds have fledged and left the nest.
  7. Note to Applicant: Biodiversity enhancements are required in accordance with Local Plan policy DM 11 and NPPF paragraphs 187d and 192 b, and are recommended in the form of a bat brick/box and swift nest brick/box. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight.
  8. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.