Loft conversion with 2.no dormers 2.no roof lights. Extension to the existing garage to connect to the bungalow. Re-roofing of the glazed conservatory roof to a solid roof finish. To replace the chimney to a new flue. Alterations to fenestration
1 COMPTON CLOSE, EASTLEIGH, SO50 4RE
Decided PermitReference: H/25/99037Eastleigh Borough Council
Last published check: 22 Sept 2026, 08:08. Check the council record for more recent changes.
Application timeline
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Loft conversion with 2.no dormers 2.no roof lights. Extension to the existing garage to connect to the bungalow. Re-roofing of the glazed conservatory roof to a solid roof finish. To replace the chimney to a new flue. Alterations to fenestration
Proposal details
Reference
H/25/99037
Alternative references
13837639- M/D
Ward
Eastleigh North Ward
Parish
Boyatt Wood CP
Agent
Temple Ford Design (Mr Joshua Clarke)
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall be implemented in accordance with the following plans numbered: D01 Rev C, D02 Rev C, 900, 901, 902, D03 Rev C, D00, D06, and D04 Rev C. Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building or shall otherwise accord with the details shown on the approved plan numbered: D06. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
The development hereby permitted shall be carried out in accordance with the mitigation and enhancement measures set out in the Bat Activity and Nesting Birds Report (ABR Ecology, August 2025). The measures shall be fully implemented before the development is first brought into use and thereafter retained. Reason: To safeguard protected species.
Note to Applicant: The applicant is advised that during construction, precautionary working method for hedgehogs should be followed to minimise harm to wildlife. It should include: All building materials to be stored on hard standing or on pallets, as far as possible from hedgerows, scrub or potential habitat.Any excavations must be covered at night or be fitted with a small animal escape ramp.No fires can be lit on site.Waste must be stored in a skip and not be allowed to accumulate in piles which could be used by wildlife. Any chemicals and fuels must be stored carefully and away from potential wildlife habitat.Any animals found on site should not be handled but be allowed to move away to a place of safety on their own.
Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.