Council planning record

Single storey front extension to provide garage and entrance porch.

5 NICHOL ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 5AY

Decided PermitReference: H/25/99031Eastleigh Borough Council

Last published check: 22 Sept 2026, 08:20. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
5 Mar 2025
Validated
7 Mar 2025
Determination deadline
9 May 2025
Local authority
Eastleigh Borough Council

Application overview

Single storey front extension to provide garage and entrance porch.

Proposal details

Reference
H/25/99031
Alternative references
PP-13826895v1 manual DL
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP
Agent
J Design & Planning Ltd (Mr John Essex)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

5 NICHOL ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 5AY

This record has no verified map location.

Documents 10 of 10

DocumentPublishedAction
H_25_99031 PL_Final DecisionDecision Notice · PDF12 May 2025View
H_25_99031 Delegated Officer ReportOfficer Report · PDF6 May 2025View
AMENDED Existing & Proposed Elevations, Floor Plans, Location and Site PlanPlans · PDF2 May 2025View
Ecology response (29.4.25)Consultee Response · PDF29 Apr 2025View
Tree Officer responseConsultee Response · PDF24 Apr 2025View
Ecology response (22.4.25)Consultee Response · PDF22 Apr 2025View
Ecology responseConsultee Response · PDF31 Mar 2025View
Arboricultural Impact Assessment, Method Statement, and Tree Protection PlanTree Info · PDF7 Mar 2025View
Application Form RedactedApplication Form · PDF7 Mar 2025View
Block, Site, Floor Plans, Existing and Proposed ElevationsPlans · PDF7 Mar 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_25_99031 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 513_03_A Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in the 'Materials' section of the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. The development must accord with the arboricultural report reference 5 Nichol Road AMS February 2025 v1. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  5. Any vegetation to be removed to facilitate the development must be removed outside of bird nesting season (between the beginning of March and the end of August) or if this is not possible then only after being checked for nesting birds by a suitably qualified ecologist up to 24 hours before the start of works. If any active nests are found, work must stop, and a 5 m buffer must be erected around the nest to protect it from disturbance until after the birds have fledged and left the nest. Reason: To ensure the protection of nesting birds.
  6. Biodiversity enhancements shall be installed prior to first use of the development hereby approved in the form of a bat brick/box and a swift brick/box. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or southwest. Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. Reason: To ensure a biodiversity enhancement in accordance with policy DM11 of the Eastleigh Local Plan (2016-2036)
  7. Note to Applicant: In removing hanging tiles to accommodate the proposed development, they must be removed by hand, and if there are any signs of bats, the tile should be replaced without disturbing the bats. Bats must not be touched by anyone without a bat license.
  8. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  9. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.