The development hereby permitted shall be implemented in accordance with the following plans numbered: Proposed elevations and floor plan received 23/01/2025, Existing elevations and floor plan received 23/01/2025, Site Plan received 24/01/2025, Location Plan received 24/01/2025, Existing Front Elevation Plan received 17/01/2025, Section Plan received 14/02/2025 Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
Note to applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/imworking-on-a-building-with-bats/ive-found-a-bat-during-works.
Note to Applicant: Should any unforeseen contamination be encountered in the ground during demolition and construction process, appropriate measures should be taken in line with relevant regulations and guidance. Any excavated soils identified as contaminated or unsuitable for reuse must be removed from site and disposed of at a suitably licensed facility. Note to applicant: Due to the distance between the swimming pool and the closest residential property it is highly recommend for the swimming pool plant not to be operating during nigh time continuously if possible.
Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.