Council planning record

Single storey rear/ side extension

6 HEATHLANDS ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 1GW

Decided PermitReference: H/25/98798Eastleigh Borough Council

Last published check: 27 Sept 2026, 15:46. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
24 Jan 2025
Validated
27 Feb 2025
Determination deadline
24 Apr 2025
Local authority
Eastleigh Borough Council

Application overview

Single storey rear/ side extension

Proposal details

Reference
H/25/98798
Alternative references
13720396
Ward
Chandler's Ford Ward
Parish
Chandler's Ford CP
Agent
J&A Architectural Designs (Mr Jason Menage)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

6 HEATHLANDS ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 1GW

This record has no verified map location.

Documents 10 of 10

DocumentPublishedAction
Ecology response 24 4 25 for H 25 98798 6 HEATHLANDS ROAD, CHANDLER'S FORDConsultee Response · PDF24 Apr 2025View
H_25_98798 PL_Final DecisionDecision Notice · PDF24 Apr 2025View
Officer ReportOfficer Report · PDF24 Apr 2025View
Proposed Block PlanBlock Plan · PDF27 Feb 2025View
Proposed ElevationsElevations Plan · PDF24 Jan 2025View
Existing Ground Floor and Roof PlanPlans · PDF24 Jan 2025View
Existing ElevationsElevations Plan · PDF24 Jan 2025View
Proposed Roof, Ground Floor and Section PlanPlan · PDF24 Jan 2025View
RendersIllustration · PDF24 Jan 2025View
Site and Location PlanPlans · PDF24 Jan 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_25_98798 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered:004 Rev A, 002 Rev A, 003 Rev A, 005 Rev A, 006 Rev A Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. In order to minimise the development's impact upon species and their habitats the following is recommended: - All building materials to be stored on hard standing or on pallets, as far as possible from hedgerows, scrub or potential habitat. - Any excavations must be covered at night or be fitted with a small animal escape ramp, and no fires can be lit on site. - Waste must be stored in a skip and not be allowed to accumulate in piles which could be used by wildlife. - Any animals found on site should not be handled but be allowed to move away to a place of safety on their own. If any vegetation clearance is required to facilitate this proposal it must be done outside of bird nesting season (late February through August) or only after a check for nesting birds within 24 hours of the start of works.
  5. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.