Erection of two storey front extension and two storey rear extension. Partial demolition of existing garage to be replaced with a study/utility extension and alterations to remaining garage. Proposed first floor pitched roof to replace existing first floor flat roof and alterations to external dwelling and fenestrations.
130 PARK ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 1HQ
Decided PermitReference: H/25/100559Eastleigh Borough Council
Last published check: 14 Oct 2026, 12:16. Check the council record for more recent changes.
Application timeline
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Erection of two storey front extension and two storey rear extension. Partial demolition of existing garage to be replaced with a study/utility extension and alterations to remaining garage. Proposed first floor pitched roof to replace existing first floor flat roof and alterations to external dwelling and fenestrations.
Proposal details
Reference
H/25/100559
Alternative references
14529902
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP
Agent
PMG Building Design&Consultancy Ltd (Mr Paul Gosling)
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The development hereby permitted shall be implemented in accordance with the following plans numbered: 001 rev B, 002 rev B, 003 rev B, 004 rev B, 005 rev B, 006 rev B Reason: For the avoidance of doubt and in the interests of proper planning.
The materials to be used must match as closely as possible, in type, colour and texture those listed on drawing number 002 rev B. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
The first floor window on the south side elevation serving the en-suite of bedroom 1 and the first floor window on the rear elevation serving bedroom 3 [as marked on the approved plan 002 rev B] shall be obscure glazed to Pilkingtons level 3 or equivalent with no more than a top-hung opening top light. Once installed the windows shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
Note to applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
Note to Applicant: Biodiversity enhancements are required in accordance with Local Plan policy DM11 and NPPF paragraphs 187d and 192b, and are recommended in the form of a bat box or a swift nest box on the existing building. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight.
Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.