Council planning record

Single storey extensions and alterations to dwelling to include external decorative render finish.

8 SEVERN WAY, WEST END, SOUTHAMPTON, SO30 3FZ

Decided PermitReference: H/25/100543Eastleigh Borough Council

Last published check: 13 Oct 2026, 07:00. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
1 Dec 2025
Validated
16 Dec 2025
Determination deadline
10 Feb 2026
Local authority
Eastleigh Borough Council

Application overview

Single storey extensions and alterations to dwelling to include external decorative render finish.

Proposal details

Reference
H/25/100543
Alternative references
14502024
Ward
West End North Ward
Parish
West End CP
Agent
Jem Musselwhite Ltd (Mr Jem Musselwhite)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

8 SEVERN WAY, WEST END, SOUTHAMPTON, SO30 3FZ

This record has no verified map location.

Documents 12 of 12

DocumentPublishedAction
H_25_100543 PL_Final DecisionDecision Notice · PDF9 Feb 2026View
Delegated Officer Report - PDF VersionOfficer Report · PDF4 Feb 2026View
AMENDED Block PlanBlock Plan · PDF31 Dec 2025View
Existing Elevations & Floor PlansElevations And Floor Plan · PDF16 Dec 2025View
Elevations & Floor PlansElevations And Floor Plan · PDF16 Dec 2025View
Existing Elevations & Floor PlansElevations And Floor Plan · PDF16 Dec 2025View
Proposed Elevations & Floor PlansElevations And Floor Plan · PDF16 Dec 2025View
SUPERSEDED Parking PlanPlans · PDF5 Dec 2025View
Design and Access StatementDesign And Access Statement1 Dec 2025View
Location PlanLocation Plan · PDF1 Dec 2025View
SUPERSEDED Block PlanBlock Plan · PDF1 Dec 2025View
Application Form RedactedApplication Form · PDF1 Dec 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_25_100543 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: Location Plan, Proposed Block Plan submitted 31/12/2025, 2025063/001B, 2025063/002B, 2025063/003A, 2025063/004B. Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing dwelling. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  5. Note to applicant: Any vegetation to be removed to facilitate the development must be removed outside of bird nesting season (which is usually between the beginning of March and the end of August). If this is not possible then vegetation can be cleared only after being checked for nesting birds by a suitably qualified ecologist up to 24 hours before the start of works. If any active nests are found, work must stop, and a 5 m buffer must be erected around the nest to protect it from disturbance until after the birds have fledged and left the nest. Any excavations or open pipes will need to be covered at night, or provided with a small animal escape ramp (a rough board at a shallow angle) to allow animals to escape if they fall in. If animals are found on site, they should not be handled but must be allowed to move away to safety on their own.
  6. Note to applicant: Biodiversity enhancements will be required in accord with Local Plan policy DM 11 and NPPF (December 2024) paragraphs 187d and 192 b. A bat box and a swift nest box may be appropriate for this building. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm )
  7. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.