The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The development hereby permitted shall be implemented in accordance with the following plans numbered: location plan, 01, 02, 03, 04 Reason: For the avoidance of doubt and in the interests of proper planning.
The materials to be used must match as closely as possible, in type, colour and texture to those listed in the materials section of the application form and the "Heat Pump Specifications". Reason: To ensure a satisfactory visual relationship of the new development to the existing.
Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
a) Prior to the installation of the approved heat pump, full details - including plans - of the proposed acoustic fence or enclosure (whichever option is pursued) to provide noise mitigation, as set out in the Environmental Noise Assessment (Clear Acoustic Design, 27/02/2026), shall be submitted to and approved in writing by the Local Planning Authority. b) The air source heat pump shall thereafter be installed in accordance with the details approved under part (a) of this condition, and shall be operated and maintained in full accordance with the recommendations set out in the Environmental Noise Assessment (Clear Acoustic Design, 27/02/2026). Reason: To protect the amenity of neighbouring occupiers in accordance with local plan policies on residential amenity and noise.
Note to applicant: Biodiversity enhancements will be required in accord with Local Plan policy DM 11 and NPPF (December 2024) paragraphs 187d and 192 b. A bat box and a swift nest box may be appropriate for this building. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.wildaboutgardens.org.uk/sites/default/files/2022- 03/WAG16%20Bats%20updated%202022%20WEB.pdf - Stars of the Night guide to attract bats into your garden https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-helpbirds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm https://www.hedgehogstreet.org/help-hedgehogs/hedgehog-homes/ www.bats.org.uk/resources/guidance-for-professionals/landscape-and-urban-design-forbats-and-biodiversity https://ptes.org/my-garden/ https://www.ukbutterflies.co.uk/foodplants.php
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.