Council planning record

Construction of a rear single storey extension

165 UNDERWOOD ROAD, BISHOPSTOKE, EASTLEIGH, SO50 6GR

Decided PermitReference: H/25/100308Eastleigh Borough Council

Last published check: 13 Oct 2026, 12:32. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
23 Oct 2025
Validated
30 Oct 2025
Determination deadline
25 Dec 2025
Local authority
Eastleigh Borough Council

Application overview

Construction of a rear single storey extension

Proposal details

Reference
H/25/100308
Alternative references
14433621
Ward
Bishopstoke Ward
Parish
Bishopstoke CP
Agent
BJC Design Southeast Ltd (Mr Brendan Carroll)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

165 UNDERWOOD ROAD, BISHOPSTOKE, EASTLEIGH, SO50 6GR

This record has no verified map location.

Documents 15 of 15

DocumentPublishedAction
H_25_100308 PL_Final Decision (1)Decision Notice · PDF9 Dec 2025View
Officer ReportOfficer Report · PDF9 Dec 2025View
05 12 2025 Ecology response for H 25 100308 165 UNDERWOOD ROADConsultee Response · PDF9 Dec 2025View
GISConsultation Response · PDF7 Nov 2025View
SW ResponseConsultation Response · PDF7 Nov 2025View
Rear Elevation Plan AMENDEDElevations Plan · PDF30 Oct 2025View
Elevation Plans - Existing AMENDEDElevations Plan · PDF30 Oct 2025View
Elevation Plans - Proposed AMENDEDElevations Plan · PDF30 Oct 2025View
Block PlanBlock Plan · PDF23 Oct 2025View
Application Form REDACTEDApplication Form · PDF23 Oct 2025View
Location PlanLocation Plan · PDF23 Oct 2025View
Ground Floor Plan - ProposedFloor Plan · PDF23 Oct 2025View
Cross Section PlanSection Plan · PDF23 Oct 2025View
Ground Floor Plan - ExistingFloor Plan · PDF23 Oct 2025View
Site Layout Plan - ExistingSite Layout Plan · PDF23 Oct 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_25_100308 PL_Final Decision (1)
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: block plan, location plan, 001, 002, 003, 004, 005, 006, 007 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  5. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.