Council planning record

Alterations and extension to roof to create first floor accommodation and construction of detached double garage

NEWARK, BOTLEY ROAD, HORTON HEATH, EASTLEIGH, SO50 7DT

Decided PermitReference: H/25/100288Eastleigh Borough Council

Last published check: 13 Oct 2026, 12:51. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
20 Oct 2025
Validated
24 Oct 2025
Determination deadline
19 Dec 2025
Local authority
Eastleigh Borough Council

Application overview

Alterations and extension to roof to create first floor accommodation and construction of detached double garage

Proposal details

Reference
H/25/100288
Alternative references
14424813
Ward
West End North Ward;Fair Oak & Horton Heath Ward
Parish
Fair Oak and Horton Heath CP
Agent
Wildern Architecture Ltd (Nicholas Jenkins)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

NEWARK, BOTLEY ROAD, HORTON HEATH, EASTLEIGH, SO50 7DT

This record has no verified map location.

Documents 9 of 9

DocumentPublishedAction
H_25_100288 PL_Final DecisionDecision Notice · PDF3 Dec 2025View
H_25_100288 Delegated Officer ReportOfficer Report · PDF1 Dec 2025View
Ecology Consultation ResponseConsultee Response · PDF28 Nov 2025View
Parish Council Consultation ResponseConsultation Response20 Nov 2025View
Consultation Response Letter from Southern WaterConsultation Response · PDF7 Nov 2025View
Proposed Elevation, Floor, Roof and Block PlansElevations And Floor Plan · PDF24 Oct 2025View
Location PlanLocation Plan · PDF20 Oct 2025View
Application Form RedactedApplication Form · PDF20 Oct 2025View
Proposed Garage Elevations, Roof and Floor PlansPlans · PDF20 Oct 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_25_100288 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: 101, 001,102 Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in the materials section of the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  5. Note to applicant: Prior to the commencement of development, the developer must advise the local authority, in consultation with Southern Water, of measures which will be undertaken to protect the public sewers.
  6. Note to applicant: Prior to commencement, the developer must liaise with Southern Water regarding an investigation of the sewer is to confirm its size and depth, ascertain its condition, number of properties served, and potential means of access and any actions required.
  7. Note to applicant: A precautionary working method must be used to prevent harm to wildlife that could be using this site. It should include: - All building materials to be stored on hard standing or on pallets, as far as possible from hedgerows, scrub or potential habitat. - Any excavations must be covered at night or be fitted with a small animal escape ramp - No fires can be lit on site - Waste must be stored in a skip and not be allowed to accumulate in piles which could be used by wildlife. Any chemicals and fuels must be stored carefully and away from potential wildlife habitat Any animals found on site should not be handled but be allowed to move away to a place of safety on their own. Any vegetation to be removed to facilitate the development must be removed outside of bird nesting season (which is usually between the beginning of March and the end of August). If this is not possible then vegetation can be cleared only after being checked for nesting birds by a suitably qualified ecologist up to 24 hours before the start of works. If any active nests are found, work must stop, and a 5 m buffer must be erected around the nest to protect it from disturbance until after the birds have fledged and left the nest.
  8. Note to applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-abat-during-works.
  9. Note to applicant: Biodiversity enhancements will be required in accord with Local Plan policy DM 11 and NPPF (December 2024) paragraphs 187d and 192 b. A bat box and a swift nest box may be appropriate for this building. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk/our-work/buildings-planning-and-development/batboxes/putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.wildaboutgardens.org.uk/sites/default/files/2022- 03/WAG16%20Bats%20updated%202022%20WEB.pdf - Stars of the Night guide to attract bats into your garden https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-forpollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-helpbirds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm https://www.hedgehogstreet.org/help-hedgehogs/hedgehog-homes/ www.bats.org.uk/resources/guidance-for-professionals/landscape-and-urbandesign-for-bats-and-biodiversity https://ptes.org/my-garden/ https://www.ukbutterflies.co.uk/foodplants.php
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.