Council planning record

Single-storey rear extension, first-floor side/rear extension, infill of existing side canopy with pitched roof, and replacement of existing front porch.

13 WESTWOOD GARDENS, CHANDLER'S FORD, EASTLEIGH, SO53 1FN

Decided PermitReference: H/25/100217Eastleigh Borough Council

Last published check: 13 Oct 2026, 15:06. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
7 Oct 2025
Validated
7 Oct 2025
Determination deadline
2 Dec 2025
Local authority
Eastleigh Borough Council

Application overview

Single-storey rear extension, first-floor side/rear extension, infill of existing side canopy with pitched roof, and replacement of existing front porch.

Proposal details

Reference
H/25/100217
Alternative references
14375762
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP
Agent
J Design & Planning Ltd (Mr John Essex)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

13 WESTWOOD GARDENS, CHANDLER'S FORD, EASTLEIGH, SO53 1FN

This record has no verified map location.

Documents 5 of 5

DocumentPublishedAction
H_25_100217 PL_Final DecisionDecision Notice · PDF2 Dec 2025View
H_25_100217 Delegated Officer ReportOfficer Report · PDF1 Dec 2025View
Application Form REDACTEDApplication Form · PDF7 Oct 2025View
Existing & Proposed Floor, Elevations, Site & Location PlansPlans · PDF7 Oct 2025View
Biodiversity ChecklistSupporting Documents · PDF7 Oct 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_25_100217 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 530_03 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building or otherwise be in accordance with those in the Application Form. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. The development shall be carried out in full accordance with the approved Site Plan (drawing no. 530_03), including the Construction Exclusion Zone (CEZ) as shown. No construction works, storage of materials, plant or machinery, groundworks, or any other development activity shall take place within the CEZ at any time during the construction period. Reason: To ensure the protection of trees during construction.
  5. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  6. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.