Council planning record

Erection of a single-storey rear extension and a first-floor front extension, demolition and replacement of the existing garage with a pitched roof and modest forward projection, removal of the existing chimney, installation of front-facing rooflights, and associated alterations to fenestration and internal layout (Amended description)

CHERRY COURT, SALTERNS LANE, BURSLEDON, SOUTHAMPTON, SO31 8DH

Decided PermitReference: H/25/100201Eastleigh Borough Council

Last published check: 13 Oct 2026, 15:15. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
6 Oct 2025
Validated
6 Oct 2025
Determination deadline
12 Feb 2026
Local authority
Eastleigh Borough Council

Application overview

Erection of a single-storey rear extension and a first-floor front extension, demolition and replacement of the existing garage with a pitched roof and modest forward projection, removal of the existing chimney, installation of front-facing rooflights, and associated alterations to fenestration and internal layout (Amended description)

Proposal details

Reference
H/25/100201
Alternative references
14379932
Ward
Bursledon & Hound North Ward
Parish
Bursledon CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

CHERRY COURT, SALTERNS LANE, BURSLEDON, SOUTHAMPTON, SO31 8DH

This record has no verified map location.

Documents 15 of 15

DocumentPublishedAction
H_25_100201 PL_Final DecisionDecision Notice · PDF3 Feb 2026View
Committee Officer ReportOfficer Report · PDF30 Jan 2026View
Built Heritage Consultant CommentConsultation Response30 Oct 2025View
Ecology response for H 25 100201 CHERRY COURT, SALTERNS LANE, BURSLEDONConsultee Response · PDF28 Oct 2025View
Proposed Ground and First Floor PlansFloor Plan · PDF6 Oct 2025View
Existing Ground and First Floor PlansFloor Plan · PDF6 Oct 2025View
Application Form REDACTEDApplication Form · PDF6 Oct 2025View
Existing North and West Elevations PlanElevations Plan · PDF6 Oct 2025View
Existing Massing Model (3D)Supporting Documents · PDF6 Oct 2025View
Heritage and Supporting Planning StatementSupporting Documents · PDF6 Oct 2025View
Proposed South and East Elevations PlanElevations Plan · PDF6 Oct 2025View
Proposed North and West Elevations PlanElevations Plan · PDF6 Oct 2025View
Proposed Topographic SurveySurvey Plan · PDF6 Oct 2025View
Existing South and East Elevations PlanElevations Plan · PDF6 Oct 2025View
Location PlanLocation Plan · PDF6 Oct 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_25_100201 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans: Location Plan, Exist PRCC 01, Exist PRCC 02, Exist PRCC 03, PROP PRCC 04, PROP PRCC 05, PROP PRCC 06, 10203/01/1, and Mass 01. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. No excavation, demolition or development related works shall take place on site until a scaled and referenced tree protection plan, as per British Standard 5837:2012 (Trees in Relation to Design, Demolition and Construction – Recommendations), is submitted and approved by the Local Planning Authority. The approved tree protection plan must be adhered to in full and may only be modified subject to written agreement from the Local Planning Authority. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  5. Note to Applicant: To safeguard wildlife, the development must proceed in accordance with the following precautionary working method: All building materials to be stored on hard standing or on pallets, as far as possible from hedgerows, scrub or potential habitat.Any excavations must be covered at night or be fitted with a small animal escape ramp.No fires can be lit on site.Waste must be stored in a skip and not be allowed to accumulate in piles which could be used by wildlife. Any chemicals and fuels must be stored carefully and away from potential wildlife habitat.Any animals found on site should not be handled but be allowed to move away to a place of safety on their own.
  6. Note to Applicant: The applicant is encouraged to incorporate biodiversity enhancements such as a bat brick/box and a swift nest box in the building. These should be positioned following best practice guidance, away from artificial light sources and with suitable orientation.
  7. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  8. Note to Applicant: Any vegetation to be removed to facilitate the development must be removed outside of bird nesting season (which is usually between the beginning of March and the end of August). If this is not possible then vegetation can be cleared only after being checked for nesting birds by a suitably qualified ecologist up to 24 hours before the start of works. If any active nests are found, work must stop, and a 5 m buffer must be erected around the nest to protect it from disturbance until after the birds have fledged and left the nest.
  9. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  10. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.