The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The development hereby permitted shall be implemented in accordance with the following plans numbered: 534_03 Reason: For the avoidance of doubt and in the interests of proper planning.
The materials to be used must match as closely as possible, in type, colour and texture those listed in the 'Materials' section of the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
Biodiversity enhancements shall be installed on-site prior to first use of the development hereby approved, and thereafter retained, in the form of a minimum of 1no. bat box and 1no. bird box. Biodiversity enhancements shall be installed in line with the 'Suggested biodiversity enhancements' listed on pages 10 to 12 of the submitted Preliminary Roost Appraisal (Final 1.0 - 18/12/2025) by ArbTech. Reason: To ensure a biodiversity enhancement in accordance with policy DM11 of the Eastleigh Local Plan (2016-2036)
Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
Note to Applicant: New exterior lighting should be avoided, but if necessary for security purposes, then the latest updated lighting guidance note (GN08/23) should be followed. This is available at https://theilp.org.uk/publication/guidance-note-8-bats-and-artificial-lighting/. A low impact lighting strategy shall be adopted for the site during post-development which outlines the areas of the site that will be retained as dark corridors. Parameters can be found on the Bat Conservation Trust website: https://www.bats.org.uk/our-work/buildings-planning-and-development/lighting
Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.