Approved Plans: The development hereby permitted shall be implemented in accordance with the following plans numbered: 1073-PRA-NB-00-DR-A-1100-C; 1073-PRA-NB-00-DR-A-1103-J; 1073-PRA-NB-00-DR-A-1130-K; 1073-PRA-NB-RF-DR-A-1132-I; 1073-PRA-NB-XX-DR-A-1210-J; 1073-PRA-NB-XX-DR-A-1211-K; & 1073-PRA-NB-XX-DR-A-1212-G. Reason: For the avoidance of doubt and in the interests of proper planning.
Commencement: The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
Tree Protection: The development must accord with the arboricultural drawing reference 7269-12-25. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
CEMP: No construction or demolition work shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: a) measures to control the emission of dust and dirt generated by demolition and construction works, including measures to prevent mud on the highway; b) a scheme for controlling noise and vibration from demolition and construction activities [including details of any piling]; c) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. Reason: To limit the impact the development has on the amenity of the locality.
Working Hours: No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Public Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
Materials: The materials to be used must match as closely as possible, in type, colour and texture those listed on the approved elevation drawings. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
Ancillary Use: The development hereby permitted shall only be used in conjunction with the existing dwellinghouse and shall not, at any time, be used for business or commercial purposes. Reason: To protect the amenity of neighbouring properties and the locality.
Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.