Council planning record

Replacement lodge building

FOUR WINDS, ALLINGTON LANE, FAIR OAK, EASTLEIGH, SO50 7DD

Decided PermitReference: H/25/100087Eastleigh Borough Council

Last published check: 13 Oct 2026, 17:53. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
16 Sept 2025
Validated
10 Oct 2025
Determination deadline
12 Dec 2025
Local authority
Eastleigh Borough Council

Application overview

Replacement lodge building

Proposal details

Reference
H/25/100087
Ward
Bishopstoke Ward;Fair Oak & Horton Heath Ward
Parish
Bishopstoke CP;Fair Oak and Horton Heath CP
Agent
Luke Richards

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

FOUR WINDS, ALLINGTON LANE, FAIR OAK, EASTLEIGH, SO50 7DD

This record has no verified map location.

Documents 13 of 13

DocumentPublishedAction
H_25_100087 PL_Final DecisionDecision Notice · PDF11 Dec 2025View
Delegated Officer ReportOfficer Report · PDF11 Dec 2025View
Site and Location PlansPlans · PDF8 Oct 2025View
Elevations PlansElevations Plan · PDF8 Oct 2025View
Existing Floor PlanFloor Plan · PDF8 Oct 2025View
Proposed Site and Location PlansPlans · PDF8 Oct 2025View
Flood Risk AssementFlood Risk Assessment · PDF16 Sept 2025View
Proposed Elevations PlansElevations Plan · PDF16 Sept 2025View
Proposed Floor and Roof PlansPlans · PDF16 Sept 2025View
Preliminary Ecological AppraisalSupporting Documents · PDF16 Sept 2025View
Design and Access StatementDesign And Access Statement · PDF16 Sept 2025View
3D ViewsIllustration · PDF16 Sept 2025View
Existing Elevations PlansElevations Plan · PDF16 Sept 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_25_100087 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 01 Revision A, 02 Revision B, P001, P002, P003, P004, P005, P006. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the external surfaces of the development shall accord with those listed in Section 10 of the Application Form and on Page 4 of the submitted Design and Access Statement (LR Architecture). Reason: To ensure a satisfactory visual appearance in the interests of the character and amenity of the area.
  4. The development must accord with the arboricultural report reference 25_5837_07_26, dated 30/07/2025. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the Local Planning Authority. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  5. The following precautionary working measures shall be adhered to during demolition and construction works: Any piles of vegetation or rubble must be dismantled by hand to avoid injury to any animals that might be sheltering within it. All building materials should be stored on hard standing or on pallets, as far as possible from hedgerows, scrub or potential habitat. Any excavations must be covered at night or be fitted with a small animal escape rampNo fires should be lit on site. Waste must be stored in a skip or similar and should not be allowed to accumulate in piles which could be used by wildlife.Any chemicals and fuels must be stored carefully and away from potential wildlife habitat.Any animals found on site should not be handled but be allowed to move away to a place of safety on their own. Reason: To protect biodiversity from potential harm during demolition and construction works.
  6. Demolition of the existing building and any vegetation removal that is required to facilitate the development should be undertaken outside of the bird nesting season (1st March to 31st August inclusive), unless it has first been inspected for nesting birds by a suitably qualified ecologist, within the 24 hours prior to the commencement of the works. Any active nests that are identified, shall be retained and protected from disturbance with a 5m minimum buffer put in place until after the young have fledged and left the nest. Reason: To protect nesting birds from harm during demolition and construction works.
  7. Prior to the development hereby approved being brought into use, a minimum of one bat or bird box shall be installed on the building and thereafter maintained. Reason: To secure a net gain for biodiversity.
  8. The building hereby approved shall not be occupied at any time other than for purposes ancillary to the residential use of the main dwellinghouse on the site known as Four Winds, Allington Lane, Fair Oak, Eastleigh, SO50 7DD. Reason: To ensure that the building functions as ancillary accommodation only, to protect the character of the countryside, and as the site is not considered suitable for sub-division into two separate dwellings.
  9. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  10. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.