Council planning record

Single storey side and rear and side extension following removal of shed

73 MONKS WAY, EASTLEIGH, SO50 5BG

Decided PermitReference: H/24/98621Eastleigh Borough Council

Last published check: 27 Sept 2026, 22:58. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
10 Dec 2024
Validated
2 Jan 2025
Determination deadline
27 Feb 2025
Local authority
Eastleigh Borough Council

Application overview

Single storey side and rear and side extension following removal of shed

Proposal details

Reference
H/24/98621
Alternative references
13609362
Ward
Eastleigh South Ward
Parish
Eastleigh Town CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

73 MONKS WAY, EASTLEIGH, SO50 5BG

This record has no verified map location.

Documents 12 of 12

DocumentPublishedAction
H_24_98621 PL_Final DecisionDecision Notice · PDF27 Feb 2025View
H_24_98621 Delegated Officer ReportOfficer Report · PDF27 Feb 2025View
AMENDED Proposed Elevations and Floor PlansElevations And Floor Plan · PDF26 Feb 2025View
Ecology response 11 2 25 for H 24 98621 73 MONKS WAY, EASTLEIGHConsultee Response · PDF11 Feb 2025View
Southern Water response (GIS)Consultee Response · PDF13 Jan 2025View
Southern Water responseConsultee Response · PDF13 Jan 2025View
Ecology response for H 24 98621 73 MONKS WAY, EASTLEIGHConsultee Response · PDF3 Jan 2025View
Existing Elevations and Floor PlanElevations And Floor Plan · PDF2 Jan 2025View
Proposed Block PlanPlan2 Jan 2025View
Existing Block PlanBlock Plan · PDF16 Dec 2024View
Location PlanLocation Plan · PDF16 Dec 2024View
Application Form RedactedApplication Form · PDF10 Dec 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_24_98621 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: Location Plan; Existing Block Plan; Proposed Block Plan; MW-001-REV 2 and MW-002-REV 3. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed on plan number: MW-002-REV 3 Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. The removal of any vegetation to facilitate the development shall take place outside of bird nesting season (between the beginning of March and the end of August) or within 24 hours of being checked for nesting birds by a suitably qualified ecologist. Any active nests must be protected from disturbance by a 5m buffer until after the chicks have fledged and left the nest. Reason: To ensure the protection of nesting birds.
  5. Biodiversity enhancements shall be installed prior to first use of the development hereby approved in the form of a bat brick/box and a swift brick/box and thereafter retained. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. Reason: To ensure a biodiversity enhancement in accordance with policy DM11 of the Eastleigh Local Plan (2016-2036)
  6. Note to Applicant: The gravity sewer on site requires a clearance of 3 metres on either side of the sewer to protect it from construction works and to allow for future maintenance access. No development or tree planting should be carried out within 3 metres of the external edge of the public gravity sewer without consent from Southern Water. All existing infrastructure should be protected during the course of construction works. Please refer to: https://www.southernwater.co.uk/media/st5orjvm/stand-off-distances.pdf - For further advice, please contact Southern Water (Tel: 0330 303 0119). Website: southernwater.co.uk or by email at: SouthernWaterPlanning@southernwater.co.uk
  7. Note to Applicant: Precautionary working methods must be followed to protect nesting birds, hedgehogs, reptiles and amphibians, during construction. This shall include: - All building materials to be stored on hard standing or on pallets, as far as possible from hedgerows, scrub or potential habitat. - Any excavations must be covered at night or be fitted with a small animal escape ramp. - No fires can be lit on site. - Waste must be stored in a skip and not be allowed to accumulate in piles which could be used by wildlife. - Any animals found on site should not be handled but be allowed to move away to a place of safety on their own.
  8. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  9. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.