Council planning record

Single storey side and rear extension following the demolition of the existing conservatory, garage and lean to. New roof with sunlight

MAGOR, 14C MAPLETON ROAD, HEDGE END, SOUTHAMPTON, SO30 0GL

Decided PermitReference: H/24/98416Eastleigh Borough Council

Last published check: 28 Sept 2026, 11:51. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
28 Oct 2024
Validated
30 Oct 2024
Determination deadline
25 Dec 2024
Local authority
Eastleigh Borough Council

Application overview

Single storey side and rear extension following the demolition of the existing conservatory, garage and lean to. New roof with sunlight

Proposal details

Reference
H/24/98416
Alternative references
13519167
Ward
Hedge End South Ward
Parish
Hedge End CP
Agent
Mr Paul Blay

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

MAGOR, 14C MAPLETON ROAD, HEDGE END, SOUTHAMPTON, SO30 0GL

This record has no verified map location.

Documents 14 of 14

DocumentPublishedAction
H_24_98416 PL_Final DecisionDecision Notice · PDF18 Dec 2024View
Officer ReportOfficer Report · PDF17 Dec 2024View
Ecology response 13 12 24 for H 24 98416 MAGOR, 14C MAPLETON ROAD, HEDGE ENDConsultee Response · PDF13 Dec 2024View
Parish CommentsConsultation Response · PDF25 Nov 2024View
Proposed Sections PlansSection Plan · PDF30 Oct 2024View
Proposed Renders PlanPlan · PDF30 Oct 2024View
Existing Floor and Roof PlansPlans · PDF30 Oct 2024View
Proposed Elevations PlanElevations Plan · PDF30 Oct 2024View
Existing Renders PlanPlan · PDF30 Oct 2024View
Existing Elevations PlanElevations Plan · PDF30 Oct 2024View
Proposed Floor and Roof PlansPlans · PDF30 Oct 2024View
Site PlanSite Layout Plan · PDF28 Oct 2024View
Location PlanLocation Plan · PDF28 Oct 2024View
Application Form RedactedApplication Form · PDF28 Oct 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_24_98416 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: DWG PLANS 03424 Rev A, DWG PLANS 03427 Rev A, DWG PLANS 03429 Rev A, DWG PLANS 3426 Rev A, DWG PLANS 03425 Rev A, DWG PLANS 03430 Rev A, DWG PLANS 03428 Rev A, LOC 001 and DWG PLANS 03431 Rev A Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/imworking-on-a-building-with-bats/ive-found-a-bat-during-works. Any vegetation to be removed to facilitate the development must be removed outside of bird nesting season (which is usually between the beginning of March and the end of August) or if this is not possible then only after being checked for nesting birds by a suitably qualified ecologist up to 24 hours before the start of works. If any active nests are found, work must stop, and a 5 m buffer must be erected around the nest to protect it from disturbance until after the birds have fledged and left the nest.
  5. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.