Council planning record

Single storey side and rear extensions following demolition of car port

18 SEA VIEW ESTATE, NETLEY ABBEY, SOUTHAMPTON, SO31 5BP

Decided PermitReference: H/24/98354Eastleigh Borough Council

Last published check: 28 Sept 2026, 01:53. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
14 Oct 2024
Validated
11 Dec 2024
Determination deadline
12 Feb 2025
Local authority
Eastleigh Borough Council

Application overview

Single storey side and rear extensions following demolition of car port

Proposal details

Reference
H/24/98354
Alternative references
13482368 & 13842029
Ward
Hamble & Netley Ward
Parish
Hound CP
Agent
Apple Tree Architecture (Mr Lee McIlveen)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

18 SEA VIEW ESTATE, NETLEY ABBEY, SOUTHAMPTON, SO31 5BP

This record has no verified map location.

Documents 14 of 14

DocumentPublishedAction
H_24_98354 PL_NMA AcceptedNonmaterial Minor Amendment · PDF4 Apr 2025View
AMENDED Proposed Front and Side ElevationsNonmaterial Minor Amendment · PDF10 Mar 2025View
Application Form RedactedNonmaterial Minor Amendment · PDF10 Mar 2025View
AMENDED Proposed Floor Plans and Site PlansNonmaterial Minor Amendment · PDF10 Mar 2025View
H_24_98354 Delegated Officer ReportOfficer Report · PDF12 Feb 2025View
H_24_98354 PL_Final DecisionDecision Notice · PDF12 Feb 2025View
AMENDED Existing & Proposed Rear Elevation, Location and Block PlanPlans · PDF12 Feb 2025View
SUPERSEDED Existing & Proposed Front and Side ElevationsElevations Plan · PDF4 Feb 2025View
SUPERSEDED Existing & Proposed Ground Floor and Roof PlanFloor Plan · PDF4 Feb 2025View
Ecology response 29 1 25 for H 24 98354 18 SEA VIEW ESTATE, NETLEY ABBEYConsultee Response · PDF29 Jan 2025View
Hound Parish Council responseParish Response · PDF14 Jan 2025View
Ecology response for H 24 98354 18 SEA VIEW ESTATE, NETLEY ABBEYConsultee Response · PDF23 Dec 2024View
Hampshire Countryside Service responseConsultee Response · PDF23 Dec 2024View
Application Form RedactedApplication Form · PDF14 Oct 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_24_98354 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: Sheet 1 Rev 4, Sheet 2 Rev 4 and Sheet 3 Rev 4. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in the 'Materials Schedule' on the plan numbered: Sheet 3 Rev 4. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. Biodiversity enhancements shall be installed prior to first use of the development hereby approved in the form of a bat brick/box and a swift brick/box. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. Reason: To ensure a biodiversity enhancement in accordance with policy DM11 of the Eastleigh Local Plan (2016-2036)
  5. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  6. Note to Applicant: Any vegetation or structures to be removed to facilitate the development must be removed outside of bird nesting season (which is usually between the beginning of March and the end of August) or if this is not possible then only after being checked for nesting birds up to 24 hours before the start of works. If any active nests are found, work must stop, and a 5 m buffer must be erected around the nest to protect it from disturbance until after the birds have fledged and left the nest.
  7. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.