Council planning record

Two storey side, single storey front and single storey rear extension following removal of existing garage.

17 WELLAND GARDENS, WEST END, SOUTHAMPTON, SO18 3PU

Decided PermitReference: H/24/98253Eastleigh Borough Council

Last published check: 28 Sept 2026, 18:08. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
23 Sept 2024
Validated
24 Sept 2024
Determination deadline
19 Nov 2024
Local authority
Eastleigh Borough Council

Application overview

Two storey side, single storey front and single storey rear extension following removal of existing garage.

Proposal details

Reference
H/24/98253
Alternative references
13429866
Ward
West End South Ward
Parish
West End CP
Agent
MDT Design (Mr Matthew Tate)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

17 WELLAND GARDENS, WEST END, SOUTHAMPTON, SO18 3PU

This record has no verified map location.

Documents 8 of 8

DocumentPublishedAction
H_24_98253 PL_Final DecisionDecision Notice · PDF12 Nov 2024View
H_24_98253 Delegated Officer ReportOfficer Report · PDF11 Nov 2024View
Tree Consultation ResponseConsultee Response · PDF16 Oct 2024View
Ecology response for H 24 98253 17 WELLAND GARDENS, WEST ENDConsultee Response · PDF2 Oct 2024View
Hampshire Biodiversity · PDF24 Sept 2024View
Existing & Proposed Elevations and Floor PlansElevations And Floor Plan · PDF24 Sept 2024View
Location & Site PlanLocation Plan · PDF24 Sept 2024View
Application FormApplication Form · PDF23 Sept 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_24_98253 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 3212/08_01_B - Existing and Proposed Elevations and Floor Plans3212/08_02_B - Location and Site Plan Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing dwelling. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. The first floor bathroom window on the western side elevation shall be obscure glazed to Pilkingtons level 3 or equivalent with no more than a top-hung opening top light. Once installed the window shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
  5. The development hereby permitted shall follow a precautionary working method which shall include: All building materials to be stored on hard standing or on pallets, as far as possible from hedgerows, scrub or potential habitat;Any excavations must be covered at night or be fitted with a small animal escape ramp;No fires to be lit on site;Waste must be stored in a skip and not be allowed to accumulate in piles which could be used by wildlife;Any animals found on site should be handled but be allowed to move away to a place of safety on their own; andIf any vegetation needs to be removed to facilitate the development, it must be removed outside of bird nesting season (which is usually between the beginning of March and the end of August) or if this is not possible then only after being checked for nesting birds by a suitably qualified ecologist. If any active nests are found, work must stop, and a 5 metre buffer must be erected around the nest to protect it from disturbance until after the birds have fledged and left the nest. Reason: To protect wildlife species and their habitats
  6. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  7. Note to applicant: There are opportunities for the site to be enhanced to benefit wildlife. The building may be suitable for a bat or bird box and additional planting could be provided to attract birds and pollinating insects. Further information about bat boxes can be found via the following link: Home - Bat Conservation Trust (bats.org.uk). Links to further advice are set out in the Ecologist’s response to the application.
  8. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  9. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.