Council planning record

Installation of an air source heat pump (1no.) at the front of the property

68 SHERBORNE WAY, HEDGE END, SOUTHAMPTON, SO30 0JP

Decided PermitReference: H/24/98149Eastleigh Borough Council

Last published check: 28 Sept 2026, 19:19. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
6 Sept 2024
Validated
16 Sept 2024
Determination deadline
11 Nov 2024
Local authority
Eastleigh Borough Council

Application overview

Installation of an air source heat pump (1no.) at the front of the property

Proposal details

Reference
H/24/98149
Alternative references
13390942
Ward
Hedge End South Ward
Parish
Hedge End CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

68 SHERBORNE WAY, HEDGE END, SOUTHAMPTON, SO30 0JP

This record has no verified map location.

Documents 15 of 15

DocumentPublishedAction
H_24_98149 PL_Final DecisionDecision Notice · PDF25 Oct 2024View
H_24_98149 Delegated Officer ReportOfficer Report · PDF24 Oct 2024View
Hedge End Town Consultation ResponseConsultation Response · PDF18 Oct 2024View
Southern Water GIS MapConsultation Response · PDF1 Oct 2024View
Southern Water Consultation ResponseConsultation Response · PDF1 Oct 2024View
Environmental Health Consultation ResponseConsultation Response · PDF25 Sept 2024View
Flood Risk Assessment ReportFlood Risk Assessment · PDF16 Sept 2024View
Location PlanLocation Plan · PDF16 Sept 2024View
Design StatementDesign And Access Statement · PDF6 Sept 2024View
MCS-020 Full Power - Noise AssessmentSupporting Documents · PDF6 Sept 2024View
Application FormApplication Form · PDF6 Sept 2024View
Vaillant 7kW specification sheetSupporting Documents · PDF6 Sept 2024View
MCS-020 at 45 Degree Design TempSupporting Documents · PDF6 Sept 2024View
Existing and Proposed ElevationsElevations Plan · PDF6 Sept 2024View
Site PlanSite Layout Plan · PDF6 Sept 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_24_98149 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans: Existing and Proposed ElevationsLocation PlanSite Plan Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The sound levels of the air source heat pump hereby permitted shall not exceed 42.1dB in accordance with the submitted MCS020 assessment. Reason: To protect the amenity of neighbouring residents from adverse noise impacts, in accordance with Policy DM8 of the Eastleigh Borough Local Plan (2016-2036).
  4. Note to Applicant: Notwithstanding the approved planning permission; if there are any noise complaints relating to the air source heat pump post-installation, the Council is legally obligated to take action if the noise from the air source heat pump is deemed a statutory nuisance and mitigate against this.
  5. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.