Council planning record

First floor side extension supported on brick corner pier

38 GILES CLOSE, HEDGE END, SOUTHAMPTON, SO30 2TH

Decided PermitReference: H/24/97953Eastleigh Borough Council

Last published check: 29 Sept 2026, 04:10. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
2 Aug 2024
Validated
5 Aug 2024
Determination deadline
30 Sept 2024
Local authority
Eastleigh Borough Council

Application overview

First floor side extension supported on brick corner pier

Proposal details

Reference
H/24/97953
Alternative references
13302922
Ward
Hedge End North Ward
Parish
Hedge End CP
Agent
N & J Design Ltd (Mr Nik Keatley)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

38 GILES CLOSE, HEDGE END, SOUTHAMPTON, SO30 2TH

This record has no verified map location.

Documents 8 of 8

DocumentPublishedAction
H_24_97953 PL_Final DecisionDecision Notice · PDF13 Sept 2024View
H_24_97953 Delegated Officer ReportOfficer Report · PDF12 Sept 2024View
Hedge End Town CouncilParish Response · PDF5 Sept 2024View
Tree OfficerConsultee Response · PDF29 Aug 2024View
EcologyConsultation Response · PDF8 Aug 2024View
AMENDED Existing and Proposed Roof Plan, Block Plan and Location Plan, with Parking PlanPlan · PDF5 Aug 2024View
Existing Elevations and Floor PlansElevations And Floor Plan · PDF2 Aug 2024View
Proposed Elevations and Floor PlansElevations And Floor Plan · PDF2 Aug 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_24_97953 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 2024.07.01/PL01, 2024.07.01/PL02, 2024.07.01/PL03 Revision A. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. With the exception of the flat roof element of the proposed extension, the materials to be used in the construction of the external surfaces of the development hereby permitted shall match as closely as possible in type, colour and texture to those used on the existing dwellinghouse. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. No excavation, demolition or development related works shall take place on site until a scaled and referenced Tree Protection Plan, as per British Standard 5837:2012 (Trees in Relation to Design, Demolition and Construction – Recommendations), has been submitted to and approved in writing by the Local Planning Authority (LPA). The approved tree protection plan must be adhered to in full and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  5. No excavation, demolition or development related works shall take place on site until a Tree Planting Plan and Planting Method Statement, as per British Standard 8545:2014, detailing 1no. replacement tree, have been submitted to and approved in writing by the Local Planning Authority (LPA). The approved documents must be adhered to in full and may only be modified subject to written agreement from the LPA. Tree planting must take place as soon as possible after completion of the proposed development and no later than the end of the following planting season. for a period of no less than 10 years after planting, trees which are removed, die or become seriously damaged shall be replaced as soon as reasonably practicable with others of the same species, size and number as originally approved. Reason: To maintain and enhance local tree canopy cover.
  6. Prior to the development hereby approved being brought into use, a minimum of one bat or bird box / brick shall be installed on the building. Reason: To secure a net gain for biodiversity.
  7. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  8. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at: https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  9. Note to Applicant: The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west (further details are available at: https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes/putting-up-your-box). Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight (further information is available at: https://www.swift-conservation.org/Nestboxes&Attraction.htm).
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.