Council planning record

Installation of an Air Source Heat Pump and erection of a 2.4m acoustic screen to the rear of the property (Amended Description and Plans)

3 THE HEATHERS, EASTLEIGH, SO50 5JZ

Decided PermitReference: H/24/97631Eastleigh Borough Council

Last published check: 29 Sept 2026, 08:44. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
19 Jun 2024
Validated
20 Jun 2024
Determination deadline
13 Dec 2024
Local authority
Eastleigh Borough Council

Application overview

Installation of an Air Source Heat Pump and erection of a 2.4m acoustic screen to the rear of the property (Amended Description and Plans)

Proposal details

Reference
H/24/97631
Alternative references
13146454
Ward
Eastleigh South Ward
Parish
Eastleigh Town CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

3 THE HEATHERS, EASTLEIGH, SO50 5JZ

This record has no verified map location.

Documents 14 of 14

DocumentPublishedAction
H_24_97631 PL_Final DecisionDecision Notice · PDF13 Dec 2024View
H_24_97631 Delegated Officer ReportOfficer Report · PDF12 Dec 2024View
AMENDED Existing and Proposed Floor, Elevation, Site and Location PlanPlans · PDF18 Nov 2024View
Further EH Response 171024Consultation Response · PDF17 Oct 2024View
AMENDED MCS Noise Assessment with Acoustic Screen in PlaceSupporting Documents · PDF11 Sept 2024View
Further EH Response 150824Consultation Response · PDF15 Aug 2024View
Eastleigh Town CouncilParish Response · PDF11 Jul 2024View
Further Environmental Health ResponseConsultation Response · PDF9 Jul 2024View
Environmental Health Consultation ResponseConsultation Response · PDF2 Jul 2024View
SUPERSEDED Floor, elevation, block and Location PlansPlans · PDF20 Jun 2024View
SUPERSEDED MCS noise assessment .pdfNoise Report · PDF19 Jun 2024View
ApplicationFormRedacted.pdfApplication Form · PDF19 Jun 2024View
Heat PumpIllustration19 Jun 2024View
EDLA-E 04_06_08 Technical Specifications.png19 Jun 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_24_97631 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plan numbered: PL04-P4 - Existing and Proposed Floor, Elevations, Site and Location Plan Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The acoustic screen shall be installed prior to the operation and first use of the air source heat pump (ASHP) and in accordance with approved plan reference PL04 P4. The acoustic screen shall be retained and maintained for the lifetime of the ASHP. Reason: To protect the amenity of neighbouring residents from adverse noise impacts, in accordance with Policy DM8 of the Eastleigh Borough Local Plan (2016–2036).
  4. The sound levels of the air source heat pump hereby permitted shall not exceed 42dB in accordance with the submitted MCS020 assessment. Reason: To protect the amenity of neighbouring residents from adverse noise impacts, in accordance with Policy DM8 of the Eastleigh Borough Local Plan (2016-2036).
  5. Note to Applicant: Notwithstanding the approved planning permission; if there are any noise complaints relating to the air source heat pump post-installation, the Council is legally obligated to take action if the noise from the air source heat pump is deemed a statutory nuisance and mitigate against this.
  6. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.