The development hereby permitted shall be implemented in accordance with the following plans numbered: 2409-PL-1000 - Block Plan2409-PL-1001 A - Existing Ground and First Floor Plans2409-PL-1002A - Existing Roof Plan2409-PL-1003 A - Existing Elevations2409-PL-1011 D - Proposed Floor Plan2409-PL-1012 B - Proposed Roof Plan2409-PL-1013 B - Proposed Elevations Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The materials to be used must match as closely as possible, in type, colour and texture those listed in the Material Section of the of the application form and the approved drawings. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
No development, including demolition shall start on site until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. The plan shall include details and mitigation relating to: Protection measures to prevent the Monks Brook Watercourse from pollution during construction;Precautionary working method to prevent harm to protected species including great crested newts; Construction work shall thereafter only take place in accordance with the approved CEMP. Reason: To limit the impact of the development on the amenity of the locality and to ensure no adverse impact on protected species.
Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works
Note to Applicant: Biodiversity enhancements have been recommended. Built in bat and swift nest bricks/boxes are preferred. Swift boxes can be used by other species if swifts are not using them. Bee bricks, log and brushwood piles and planting native species which produce fruit and seeds for pollinators are also recommended.
Note to Applicant: It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.