Council planning record

First floor side extension. Single storey rear extension with conservatory. New bay window elongation of porch roof

2 PARK VIEW, HEDGE END, SOUTHAMPTON, SO30 4EP

Decided PermitReference: H/24/97614Eastleigh Borough Council

Last published check: 29 Sept 2026, 09:00. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
18 Jun 2024
Validated
18 Jun 2024
Determination deadline
13 Aug 2024
Local authority
Eastleigh Borough Council

Application overview

First floor side extension. Single storey rear extension with conservatory. New bay window elongation of porch roof

Proposal details

Reference
H/24/97614
Alternative references
13161695
Ward
Hedge End South Ward
Parish
Hedge End CP
Agent
Mr Paul Blay

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

2 PARK VIEW, HEDGE END, SOUTHAMPTON, SO30 4EP

This record has no verified map location.

Documents 11 of 11

DocumentPublishedAction
H_24_97614 PL_Final DecisionDecision Notice · PDF9 Aug 2024View
H_24_97614 Delegated Officer ReportOfficer Report · PDF8 Aug 2024View
Existing Floor and Roof PlansPlans · PDF18 Jun 2024View
Existing ElevationsElevations Plan · PDF18 Jun 2024View
Location PlanLocation Plan · PDF18 Jun 2024View
Proposed RendersPlans · PDF18 Jun 2024View
Existing RendersPlan · PDF18 Jun 2024View
Site PlanSite Layout Plan · PDF18 Jun 2024View
ApplicationFormRedacted.pdfApplication Form · PDF18 Jun 2024View
Proposed Floor and Roof PlanPlan · PDF18 Jun 2024View
Proposed ElevationsElevations Plan · PDF18 Jun 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_24_97614 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 03202 Rev A, 03199 Rev A, 03197 Rev A, LOC001, 03200 Rev A, 03201 Rev A, 03196 Rev A and 03198 Rev A. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. No development shall start until a precautionary working method has been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To protect and enhance biodiversity.
  5. The proposed rear facing first floor window which is to service an ensuite, shall be obscure glazed to Pilkingtons Level 3 or greater, with no opening parts less than 1.7 metres above the floor level of the room. Reason: To protect the amenity and privacy of the adjoining residential properties.
  6. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works
  7. Note to Applicant: It is recommended to add a bat brick and a swift brick for this building as biodiversity enhancements. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm )
  8. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  9. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.