The development hereby permitted shall be implemented in accordance with the following plans numbered: A0/26LR/01 - Existing Ground Floor and Site PlansA0/26LR/02 - Existing Floor PlansA0/26LR/03 - Existing Roof PlanA0/26LR/04 - Existing Elevations and Section PlansA0/26LR/05 Rev 3 - Proposed Ground Floor PlanA0/26LR/06 Rev 4 - Proposed First Floor PlanA0/26LR/07 Rev 3 - Proposed Roof PlanA0/26LR/08 Rev 4 - Proposed Front and Rear ElevationsA0/26LR/09 Rev 4 - Proposed Side ElevationsA0/26LR/10 Rev 3 - Site and Location Plan Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
The first floor window serving bedroom two on the southwestern elevation shall either be: a) obscure glazed to Pilkingtons level 3 or equivalent with no more than a top-hung opening toplight: OR b) positioned at least 1.7 metres above the floor of the room in which is is installed. Once installed the window shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
The development must accord with the arboricultural report reference TH4688. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the locality.
Note to Applicant: It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
Note to Applicant: Biodiversity enhancements have been recommended. Built in bat and swift nest bricks/boxes are preferred. Swift boxes can be used by other species if swifts are not using them. Bee bricks, log and brushwood piles and planting native species which produce fruit and seeds for pollinators are also recommended.
Note to Applicant: If any equipment relating to the MOD is found during building works, please contact the MOD for further advice.
Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.