Council planning record

First floor side extension over existing garage.

13 OAK COPPICE CLOSE, BISHOPSTOKE, EASTLEIGH, SO50 8PH

Decided PermitReference: H/24/97143Eastleigh Borough Council

Last published check: 30 Sept 2026, 05:38. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
27 Mar 2024
Validated
5 Apr 2024
Determination deadline
31 May 2024
Local authority
Eastleigh Borough Council

Application overview

First floor side extension over existing garage.

Proposal details

Reference
H/24/97143
Alternative references
12921468
Ward
Bishopstoke Ward
Parish
Bishopstoke CP
Agent
Mr Graham Barker

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

13 OAK COPPICE CLOSE, BISHOPSTOKE, EASTLEIGH, SO50 8PH

This record has no verified map location.

Documents 12 of 12

DocumentPublishedAction
H_24_97143 Delegated Officer ReportOfficer Report · PDF30 May 2024View
H_24_97143 PL_Final DecisionDecision Notice · PDF30 May 2024View
Existing and Proposed Front and Rear ElevationsElevations Plan · PDF5 Apr 2024View
Existing First Floor PlanFloor Plan · PDF5 Apr 2024View
Proposed First Floor PlanFloor Plan · PDF5 Apr 2024View
Existing and Proposed Side ElevationsElevations Plan · PDF5 Apr 2024View
Existing and Proposed Ground Floor PlanFloor Plan · PDF5 Apr 2024View
Design & Access StatementDesign And Access Statement · PDF5 Apr 2024View
Biodiversity ChecklistEcological Assessment · PDF27 Mar 2024View
Application FormApplication Form · PDF27 Mar 2024View
Location & Block PlanLocation Plan · PDF27 Mar 2024View
Supporting PhotosPhotos · PDF27 Mar 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_24_97143 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: OCC/P/06, OCC/P/03 'A', OCC/P/04 'A', OCC/P/01 'A', OCC/P/02 'A' and OCC/P/05. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. The proposed rear facing first floor window which is to service an ensuite, shall be obscure glazed to Pilkingtons Level 3 or greater, with no opening parts less than 1.7 metres above the floor level of the room. Reason: To protect the amenity and privacy of the adjoining residential properties.
  5. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works
  6. Note to Applicant: Where Public Rights of Way are close to application sites or are used for access to the development site, they must be shown on the submitted plans with details of how they will be accommodated within the proposals. Government guidance requires that applications should not be validated unless such information has been submitted.
  7. Note to Applicant: Nothing connected with the development, or its future use, shall have an adverse effect on the Public Rights of Way, which must always remain available for safe public use at all times.
  8. Note to Applicant: No vehicles (including builder’s and contractor’s), machinery, equipment, materials, spoil, scaffolding, or anything else associated with the works, use, or occupation of the development, shall be left on or near to a Public Right of Way as to cause obstruction, hindrance, or a hazard to the legitimate users. The public retain the right to use the PROW at all times.
  9. Note to Applicant: The grant of planning permission does not entitle developers to obstruct a public right of way. The diversion or stopping up of footpaths, bridleways and restricted byways is a separate process, which must be carried out before the paths are affected by the development. It cannot be assumed that because planning permission has been granted that an Order under section 257 of the TCPA (1990) will invariably be made or confirmed. Development, in so far as it affects a PROW, must not be started and the PROW should be kept open for public use, unless or until the necessary order has come into effect.
  10. Note to Applicant: All vehicles that would be legitimately accessing the site via a Public Right of Way should give way to public users, which could include horse-riders and cyclists, at all times. In cases with legitimate vehicular access a Construction Traffic Management Plan (CTMP) should be submitted to, and approved by, Hampshire Countryside Service as Highways Authority prior to any approval by the Planning Authority, and prior to commencement, to ensure the protection of public safety.
  11. Note to Applicant: There must be no surface alterations to a Public Right of Way without the consent of Hampshire County Council as Highways Authority. Planning permission under the Town and County Planning Act (1990) does not provide this and separate consent is required. To carry out any such works without this permission would constitute an offence under Section 131 of the Highways Act (1980).
  12. Note to Applicant: No works to the surface of the Public Right of Way shall be carried out without prior approval of the HCS Area Countryside Access Manager. Any damage caused to the surface of the Public Right of Way by construction traffic will be required to be restored to the satisfaction of the Area Countryside Access Manager on the completion of the build.
  13. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  14. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.