Council planning record

Single storey side and rear extension

228 DESBOROUGH ROAD, EASTLEIGH, SO50 5NH

Decided PermitReference: H/24/97013Eastleigh Borough Council

Last published check: 30 Sept 2026, 12:51. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
5 Mar 2024
Validated
5 Mar 2024
Determination deadline
30 Apr 2024
Local authority
Eastleigh Borough Council

Application overview

Single storey side and rear extension

Proposal details

Reference
H/24/97013
Alternative references
12847474
Ward
Eastleigh South Ward
Parish
Eastleigh Town CP
Agent
MDT Design (Mr Matthew Tate)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

228 DESBOROUGH ROAD, EASTLEIGH, SO50 5NH

This record has no verified map location.

Documents 7 of 7

DocumentPublishedAction
H_24_97013 PL_Final DecisionDecision Notice · PDF23 Apr 2024View
H_24_97013 Delegated Officer ReportOfficer Report · PDF22 Apr 2024View
Eastleigh Town Council Planning CommentsConsultation Response · PDF5 Apr 2024View
Southern Water ResponseConsultation Response · PDF28 Mar 2024View
Southern Water GIS MapConsultation Response · PDF28 Mar 2024View
Existing and Proposed Elevation, Floor and Location PlansPlans · PDF5 Mar 2024View
ApplicationFormRedacted.pdfApplication Form · PDF5 Mar 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_24_97013 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plan numbered: 01 Rev A - Existing and Proposed Floor and Elevations, Location and Block Plan Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
  5. Note to Applicant: You are reminded of your duties under the Party Wall Act 1996. This requires a building owner to notify and obtain formal agreement from adjoining occupier(s) where the building owner intends to carry out work which involves: 1. Work involving an existing shared wall with another property; 2. Building on the boundary with a neighbouring property; 3. Excavating near a neighbouring building, and that work falls within the scope of the Act. Procedures under this Act are separate from the need for planning permission and building regulations approval. ‘The Party Wall etc. Act 1996: explanatory booklet’ is available at www.communities.gov.uk.
  6. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.