The development hereby permitted shall be implemented in accordance with the following plans numbered: 01_F. Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
No development shall start until a precautionary working method has been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To protect and enhance biodiversity.
No additional or altered windows shall be constructed in the side elevations of the development hereby approved. Reason: To protect the amenity and privacy of the adjoining residential properties.
The development hereby permitted shall be implemented in accordance with the recommendations outlined in the PRA, Nesting Birds and Bat Activity Survey Report by ABR Ecology (October 2024) Reason: To protect and enhance biodiversity.
Note to Applicant: A Bat Mitigation Class Licence (BMCL) from Natural England is required. The license application must be informed by update surveys done within the same season as the license application.
Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.