Council planning record

Two-storey side extension and single-storey rear extension with rear balcony. Construction of an in-ground swimming pool and the erection of 2no. outbuildings

WOODLAND VIEW, WINCHESTER ROAD, FAIR OAK, EASTLEIGH, SO50 7HD

Decided PermitReference: H/24/96722Eastleigh Borough Council

Last published check: 1 Oct 2026, 02:15. Check the council record for more recent changes.

Application location

WOODLAND VIEW, WINCHESTER ROAD, FAIR OAK, EASTLEIGH, SO50 7HD

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
17 Jan 2024
Validated
19 Jan 2024
Determination deadline
15 Mar 2024
Local authority
Eastleigh Borough Council

Application overview

Two-storey side extension and single-storey rear extension with rear balcony. Construction of an in-ground swimming pool and the erection of 2no. outbuildings

Proposal details

Reference
H/24/96722
Alternative references
12732850
Ward
Fair Oak & Horton Heath Ward
Parish
Fair Oak and Horton Heath CP
Agent
KM Planning (Mrs Katie McIntyre)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
H_24_96722 Delegated Officer ReportOfficer Report · PDF14 Mar 2024View
H_24_96722 PL_Final DecisionDecision Notice · PDF14 Mar 2024View
Existing Elevation, Floor and Roof PlansElevations And Floor Plan · PDF19 Jan 2024View
Proposed Gym Elevation, Floor and Roof Plans / Proposed Pool Section and Layout PlansElevations And Floor Plan · PDF19 Jan 2024View
Proposed Elevation, Floor and Roof PlansElevations And Floor Plan · PDF19 Jan 2024View
Site Location and Block Plan / Outbuilding Plans and ElevationsPlans · PDF17 Jan 2024View
Supporting StatementPlanning Statement · PDF17 Jan 2024View
Existing Site SurveySurvey Plan · PDF17 Jan 2024View
Previously Approved GarageElevations And Floor Plan · PDF17 Jan 2024View
Application FormApplication Form · PDF17 Jan 2024View
Proposed Site SurveySurvey Plan · PDF17 Jan 2024View
Biodiversity ChecklistEcological Assessment · PDF17 Jan 2024View
Existing and Proposed Street SceneStreet Scene Plan · PDF17 Jan 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_24_96722 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: col sht 6 Rev x, col sht 1 Rev x, col sht 2 Rev x, col sht 4 Rev x, col sht 5 Rev x, col sht 8 Rev x, col sht 3 Rev x and col sht 7 Rev x Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. No construction or site preparation works involving excavation shall start until a Construction Environment Management Plan (CEMP) has been submitted to, and approved in writing by, the Local Planning Authority. Preparation and construction work shall only take place in accordance with the approved CEMP which shall include: a) the location of temporary site buildings, compounds, construction material and plant storage areas used during demolition and construction; b) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. c) the parking of vehicles of site operatives and visitors; d) measures to control the emission of dust and dirt generated by demolition and construction; e) a scheme for controlling noise and vibration from demolition and construction activities; f) provision for storage, collection, and disposal of rubbish from the development during construction period; g) measures to prevent mud and dust on the highway during demolition and construction; h) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; i) temporary lighting; j) temporary surface water drainage provisions; and k) hours of working Reason: To limit the impact the development has on the amenity of the locality and to protect biodiversity
  5. No development shall start until a precautionary working method and a surface water drainage plan have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To protect and enhance biodiversity.
  6. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  7. Note to Applicant: If exterior lighting is required for security purposes it must follow the latest updated lighting guidance note (GN08/23) to avoid affecting bats. This is available at Guidance Note 8 Bats and Artificial Lighting | Institution of Lighting Professionals (theilp.org.uk).
  8. Note to Applicant: Biodiversity enhancements will be required. A bat brick and a swift brick may be appropriate for this building. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Bats are often found roosting above indoor swimming pools as the warmth and humidity are attractive, so a dark area of the pool building can be considered as a location for bat boxes if the orientation is correct. Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm )
  9. Note to Applicant: It is recommended to add night scented flowering plants to attract moths as food for bats.
  10. Note to Applicant: Southern Water requires a formal application for any new connection to the public foul sewer to be made by the applicant or developer. To make an application visit Southern Water's Get Connected service: developerservices.southernwater.co.uk and please read the New Connections Charging Arrangements documents which are available on the website via the following link: southernwater.co.uk/developing-building/connection-charging-arrangements
  11. Note to Applicant: It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
  12. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  13. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.