Council planning record

Single storey rear extension, raised decking area and alteration to fenestration (AMENDED DESCRIPTION)

THE BORDERS, BURSLEDON ROAD, HEDGE END, SOUTHAMPTON, SO30 0DA

Decided PermitReference: H/23/96615Eastleigh Borough Council

Last published check: 1 Oct 2026, 16:35. Check the council record for more recent changes.

Application location

THE BORDERS, BURSLEDON ROAD, HEDGE END, SOUTHAMPTON, SO30 0DA

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
20 Dec 2023
Validated
22 Dec 2023
Determination deadline
5 Apr 2024
Local authority
Eastleigh Borough Council

Application overview

Single storey rear extension, raised decking area and alteration to fenestration (AMENDED DESCRIPTION)

Proposal details

Reference
H/23/96615
Alternative references
12689217
Ward
Bursledon & Hound North Ward
Parish
Hedge End CP
Agent
Rosenthal Design Services Ltd (Mr Les Rosenthal)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
H_23_96615 Delegated Officer ReportOfficer Report · PDF4 Apr 2024View
H_23_96615 PL_Final Decision · PDF4 Apr 2024View
AMENDED Proposed First Floor PlanFloor Plan · PDF3 Apr 2024View
AMENDED Proposed Elevations PlanElevations Plan · PDF3 Apr 2024View
AMENDED Location and Site PlanLocation Plan · PDF3 Apr 2024View
Existing First Floor PlanFloor Plan · PDF3 Apr 2024View
AMENDED Proposed Ground Floor PlanFloor Plan · PDF3 Apr 2024View
Existing Ground Floor PlanFloor Plan · PDF3 Apr 2024View
Existing Elevations PlanElevations Plan · PDF3 Apr 2024View
ApplicationFormRedacted.pdfApplication Form · PDF20 Dec 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_96615 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 01, 02, 04, 05, 06, 07, and 08. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building or otherwise be in accordance with the following plan numbered: 07. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: It is recommended to add a bat brick/box and a swift brick/box for this building as biodiversity enhancements. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm )
  5. Note to Applicant: Southern Water requires a formal application for any new connection to the public foul sewer to be made by the applicant or developer. To make an application visit Southern Water's Get Connected service: developerservices.southernwater.co.uk and please read the New Connections Charging Arrangements documents which are available on the website via the following link: southernwater.co.uk/developing-building/connection-charging-arrangements. Initial investigations indicate that there are no public surface water sewers in the area to serve this development. Alternative means of draining surface water from this development are required. This should not involve disposal to a public foul sewer and should be in line with the Hierarchy of H3 of Building Regulations with preference for use of soakaways. gov.uk/government/publications/drainage-and-waste-disposal-approved-document-h It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
  6. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  7. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.