Council planning record

Single storey rear extension, loft conversion with rear dormer, front elevation window design changed

6 CRANBORNE GARDENS, CHANDLER'S FORD, EASTLEIGH, SO53 1TA

Decided PermitReference: H/23/96599Eastleigh Borough Council

Last published check: 1 Oct 2026, 17:57. Check the council record for more recent changes.

Application location

6 CRANBORNE GARDENS, CHANDLER'S FORD, EASTLEIGH, SO53 1TA

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
15 Dec 2023
Validated
15 Dec 2023
Determination deadline
22 Mar 2024
Local authority
Eastleigh Borough Council

Application overview

Single storey rear extension, loft conversion with rear dormer, front elevation window design changed

Proposal details

Reference
H/23/96599
Alternative references
12677969
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP
Agent
MDT Design (Mr Matthew Tate)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
Decision NoticeDecision Notice · PDF22 Mar 2024View
Officer ReportOfficer Report · PDF13 Mar 2024View
Ecology response amended for H 23 96599 6 CRANBORNE GARDENS, CHANDLER'S FORDConsultee Response · PDF6 Mar 2024View
Proposed and Existing Elevation, Floor, Location and Site Layout PlanElevations And Floor Plan · PDF26 Feb 2024View
Tree Officer CommentsConsultation Response16 Jan 2024View
Ecology response for H 23 96599 6 CRANBORNE GARDENS, CHANDLER'S FORDConsultee Response · PDF15 Jan 2024View
Location & Site Plans, Existing and Proposed Elevations and Floor PlansPlans · PDF15 Dec 2023View
Application FormApplication Form · PDF15 Dec 2023View
Pre-Development Arboricultural SurveyTree Info · PDF15 Dec 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Decision Notice
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 01 Rev F Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. No excavation, demolition or development related works shall take place on site until a scaled and referenced tree protection plan, as per British Standard 5837:2012 (Trees in Relation to Design, Demolition and Construction – Recommendations), is submitted and approved by the LPA. The approved tree protection plan must be adhered to in full, and may only be modified subject to written agreement from the LPA. Reason: to retain and protect the existing trees which form an important part of the amenity of the locality.
  5. Note to applicant: Precautionary working methods (to protect hedgehogs and nesting birds), should be implemented. This should include covering excavations at night and animal escape ramps where possible.
  6. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.