Council planning record

Roof extension and alterations to include raising of ridge height with front and rear hip-to-gable ends to create additional habitable accommodation in roof space, single storey side and rear extension following demolition of existing conservatory, extensions and garage.

VILLA CERVINO, BOTLEY ROAD, HORTON HEATH, EASTLEIGH, SO50 7DT

Decided PermitReference: H/23/96579Eastleigh Borough Council

Last published check: 1 Oct 2026, 04:09. Check the council record for more recent changes.

Application location

VILLA CERVINO, BOTLEY ROAD, HORTON HEATH, EASTLEIGH, SO50 7DT

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
12 Dec 2023
Validated
10 Jan 2024
Determination deadline
6 Mar 2024
Local authority
Eastleigh Borough Council

Application overview

Roof extension and alterations to include raising of ridge height with front and rear hip-to-gable ends to create additional habitable accommodation in roof space, single storey side and rear extension following demolition of existing conservatory, extensions and garage.

Proposal details

Reference
H/23/96579
Alternative references
12670779 & 13409581
Ward
Fair Oak & Horton Heath Ward
Parish
Fair Oak and Horton Heath CP
Agent
Keira Soares Design Studios (Mrs Keira Soares)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 21 of 21

DocumentPublishedAction
H_23_96579 PL_NMA AcceptedDecision · PDF25 Sept 2024View
Site PlansNonmaterial Minor Amendment · PDF20 Sept 2024View
Proposed Floor and Roof PlanNonmaterial Minor Amendment · PDF20 Sept 2024View
Proposed ElevationsNonmaterial Minor Amendment · PDF20 Sept 2024View
Application FormNonmaterial Minor Amendment · PDF16 Sept 2024View
H_23_96579 Delegated Officer ReportOfficer Report · PDF5 Mar 2024View
H_23_96579 PL_Final DecisionDecision Notice · PDF5 Mar 2024View
Ecology response amended for H 23 96579 VILLA CERVINO, BOTLEY ROAD, HORTON HEATHConsultee Response · PDF7 Feb 2024View
GIS Southern Water MapConsultation Response · PDF30 Jan 2024View
Southern Water Consultation ResponseConsultation Response · PDF30 Jan 2024View
Fair Oak Parish Council Consultation ResponseConsultation Response · PDF24 Jan 2024View
Trees Consultation ResponseConsultation Response · PDF24 Jan 2024View
Ecology response for H 23 96579 VILLA CERVINO, BOTLEY ROAD, HORTON HEATHConsultee Response · PDF16 Jan 2024View
Proposed Floor PlansFloor Plan · PDF10 Jan 2024View
Existing Floor and Roof PlansFloor Plan · PDF10 Jan 2024View
Proposed ElevationsElevations Plan · PDF10 Jan 2024View
Existing ElevationsElevations Plan · PDF10 Jan 2024View
Existing and Proposed Site PlansSite Layout Plan · PDF14 Dec 2023View
ApplicationFormRedacted.pdfApplication Form · PDF12 Dec 2023View
PEAPRASupporting Documents · PDF22 Mar 2023View
Location PlanLocation Plan · PDF5 Jan 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_96579 PL_NMA Accepted H_23_96579 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: Existing Floor and Roof Plans - LAY001 Existing Elevations - LAY002 Proposed Floor Plans - LAY003 Rev 04 Proposed Elevations - LAY004 Rev 04 Existing and Proposed Site Plans - LAY005 Location Plan - LOC01 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in the Materials Section of the application form and approved drawing LAY004 Rev 04 (Proposed Elevations). Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. The rooflight windows on the southern elevation elevation [as marked on the approved plan LAY004 Rev 03] shall be obscure glazed to Pilkingtons level 3 and non-opening. Once installed the windows shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
  5. No excavation, demolition or development related works shall take place on site until a scaled and referenced tree protection plan, as per British Standard 5837:2012 (Trees in Relation to Design, Demolition and Construction – Recommendations), is submitted and approved by the LPA. The approved tree protection plan must be adhered to in full, and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality
  6. No excavation, demolition or development related works shall start on site until a CEMP (construction environmental management plan) outlining methods to protect the watercourse and its bank and surrounding habitats from the development works has been submitted to and approved in writing by the Local Planning Authority. The CEMP shall include the precautions to protect wildlife detailed within section 6.2.1. of the preliminary ecological assessment, with the following amendments: - If vegetation or brush piles cannot be cleared outside of bird nesting season, then they must be checked by a suitably qualified ecologist immediately before clearance. If any active nests are found the nest must be protected from disturbance with a 5 m buffer until after the chicks have fledged and left the nest. The CIEEM and RSPB guidance states that netting should only be used under exceptional circumstances and only if all other alternatives have been exhausted. (see article on CIEEM and RSPB advise against netting available at: https://cieem.net). - Any vegetation/log pile/habitat that could shelter reptiles must also be removed carefully, by hand and outside of the reptile active season and the grass be kept cut short until after construction is completed so that it will not become suitable reptile habitat. - A fenced construction exclusion zone and silt fencing (such as hay bales wrapped in terram-type landscaping fabric and pegged down) must be erected before the start of works to prevent runoff and silt from the site from entering the woodland and Spear Pond Gully SINC. Silt fencing must be checked daily by the site manager and replaced immediately if damaged or breached at any time. - Re-fuelling of equipment may only be done on absorbent pads, on the drive at the front of the house and away from the slope or the woodland. - External lighting should not be used during the construction phase, or if needed to enable works, it must be shielded so that no light enters or shines on the woodland. The development shall be carried out in accordance with the approved CEMP. Reason: To avoid damage to habitats on the site.
  7. Note to Applicant: Biodiversity enhancements will be required. A bat brick and a swift brick may be appropriate for the east and west gable ends of this building
  8. Note to Applicant: New exterior lighting should be avoided, but if necessary for security purposes, then the latest updated lighting guidance note (GN08/23) should be followed. This is available at Guidance Note 8 Bats and Artificial Lighting | Institution of Lighting Professionals (theilp.org.uk).
  9. Note to Applicant: Southern Water records indicate that the extension will build close/over a 150 mm public foul sewer. Building over a “public sewer” is not normally permitted by Southern Water. An investigation of the sewer is required to confirm its size and depth, ascertain its condition, number of properties served and potential means of access before Southern Water is able to consider the works. The applicant is advised to apply to Southern Water for approval of the works through the Build Over Public Sewer application process. Further advice is provided within Southern Water's consultation response, which is available on the Council's Website here
  10. Note to Applicant: Please refer to the LSBUD Support Page (www.lsbud.co.uk/linesearchbeforeudig-support) for further guidance on the protection of pipelines/electricty infrastructure
  11. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.