Council planning record

First floor rear and single storey rear/side extensions with raised rear patio

111 HURSLEY ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 1JD

Decided PermitReference: H/23/96567Eastleigh Borough Council

Last published check: 1 Oct 2026, 16:47. Check the council record for more recent changes.

Application location

111 HURSLEY ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 1JD

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
8 Dec 2023
Validated
21 Dec 2023
Determination deadline
1 Mar 2024
Local authority
Eastleigh Borough Council

Application overview

First floor rear and single storey rear/side extensions with raised rear patio

Proposal details

Reference
H/23/96567
Alternative references
12661038
Ward
Chandler's Ford Ward
Parish
Chandler's Ford CP
Agent
CMC Design Architectural Services (Mr Chris McDermott)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 15 of 15

DocumentPublishedAction
H_23_96567 PL_Final DecisionDecision Notice · PDF27 Feb 2024View
H_23_96567 Delegated Officer ReportOfficer Report · PDF27 Feb 2024View
Proposed Floor Plans with 45-degree rule appliedFloor Plan · PDF22 Feb 2024View
Proposed Elevational Plans with 45-degree rule appliedElevations Plan · PDF22 Feb 2024View
Additional Ecology response for H 23 96567 111 HURSLEY ROAD, CHANDLER'S FORDConsultee Response · PDF19 Feb 2024View
Preliminary Roost AssessmentEcological Assessment · PDF16 Feb 2024View
GIS Southern Water Map · PDF11 Jan 2024View
Southern Water Consultation ResponseConsultation Response · PDF11 Jan 2024View
Ecology response for H 23 96567 111 HURSLEY ROAD, CHANDLER'S FORDConsultee Response · PDF28 Dec 2023View
Existing ElevationsElevations Plan · PDF21 Dec 2023View
Proposed ElevationsElevations Plan · PDF21 Dec 2023View
Location and Proposed Site PlanSite Layout Plan · PDF8 Dec 2023View
Proposed Floor and Roof PlansFloor Plan · PDF8 Dec 2023View
ApplicationFormRedacted.pdfApplication Form · PDF8 Dec 2023View
Existing Floor and Roof PlansFloor Plan · PDF8 Dec 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_96567 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: Location and Proposed Site Plan - 876/11/100 Existing Floor and Roof Plans - 876/11/101 Existing Elevations - 876/11/102 Proposed Floor and Roof Plans - 876/11/103 Proposed Elevations - 876/11/104 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in Materials Sections of the application form and approved drawing 876/11/104 (Proposed Elevations) Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. The development hereby permitted shall be implemented in full with the recommended ecological enhancements outlined in Section 5.6 of the Preliminary Roost Assessment report by Hampshire Ecological Services (February 2024). This will include the installation of sensitive lighting (for bats and other wildlife) and new bird nesting provision. Reason: To protect wildlife species and to ensure biodiversity net gain as required by the National Planning Policy Framework
  5. The demolition of the shared outbuilding shall be carried out under ecological supervision. If any bats are found, work must stop and a licence from Natural England must be applied for. Reason: To protect wildlife species
  6. Note to Applicant: Montbretia (Crocosmia crocosmifolia) an invasive plant has been identified within the rear garden. It is illegal to allow this plant to spread into the wild, so care will need to be taken to keep any soil from this area on site. Alternatively, it can be disposed of as hazardous waste by a licensed contractor.
  7. Note to Applicant: If there are any active bird nests, all work must stop and a 5m buffer created to prevent the nest from being disturbed until after the young have fledged and left the nest.
  8. Note to Applicant: It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
  9. Note to Applicant: You are reminded of your duties under the Party Wall Act 1996. This requires a building owner to notify and obtain formal agreement from adjoining occupier where the building owner intends to carry out work which involves: 1. Work involving an existing shared wall with another property; 2. Building on the boundary with a neighbouring property; 3. Excavating near a neighbouring building, and that work falls within the scope of the Act. Procedures under this Act are separate from the need for planning permission and building regulations approval. ‘The Party Wall etc. Act 1996: explanatory booklet’ is available at www.communities.gov.uk.
  10. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.