Council planning record

Two storey side/rear extension, single storey rear extension, infill single storey front extension and alterations to fenestration.

3 THE PADDOCK, EASTLEIGH, SO50 4SD

Decided PermitReference: H/23/96151Eastleigh Borough Council

Last published check: 2 Oct 2026, 13:49. Check the council record for more recent changes.

Application location

3 THE PADDOCK, EASTLEIGH, SO50 4SD

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
6 Oct 2023
Validated
6 Oct 2023
Determination deadline
1 Dec 2023
Local authority
Eastleigh Borough Council

Application overview

Two storey side/rear extension, single storey rear extension, infill single storey front extension and alterations to fenestration.

Proposal details

Reference
H/23/96151
Alternative references
12504720
Ward
Eastleigh North Ward
Parish
Allbrook and North Boyatt CP
Agent
J Design & Planning Ltd (Mr John Essex)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
H_23_96151 PL_Final DecisionDecision Notice · PDF30 Nov 2023View
H_23_96151 Delegated Officer ReportOfficer Report · PDF30 Nov 2023View
Ecology response amended for H 23 96151 3 THE PADDOCK, EASTLEIGHConsultee Response · PDF27 Nov 2023View
southern water consultationConsultee Response · PDF27 Nov 2023View
GIS · PDF27 Nov 2023View
Neighbour Objection Letter - 4 The PaddockNeighbour Letter · PDF1 Nov 2023View
Allbrook Parish Council Consultation ResponseConsultation Response · PDF24 Oct 2023View
Ecology response for H 23 96151 3 THE PADDOCK, EASTLEIGHConsultee Response · PDF19 Oct 2023View
Existing and Proposed Elevations and Floor PlansPlans · PDF6 Oct 2023View
Application FormApplication Form · PDF6 Oct 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_96151 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 463_03 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in The Materials Section of the application form and approved plan 463_03. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. No development, including demolition, shall start on site until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority, which shall include a precautionary working method to protect toads, stag beetles, hedgehogs and bats. Construction work shall only take place in accordance with the approved CEMP. Reason: To protect wildlife species, in accordance with Policies DM1 and DM11 of the Eastleigh Borough Local Plan (2016-2036).
  5. Note to Applicant: It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
  6. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  7. Note to Applicant: Any closed board fencing must contain at least two holes (15x 15 cm minimum) in the baseboards to allow free passage of small mammals. It is not likely that protected species will be affected by these proposals but if any protected species are found on site they should not be handled and Natural England should be consulted for advice. Other animals should be allowed to move away to a place of safety on their own.
  8. Note to Applicant: Any excavations and open pipes must be covered at night or fitted with a slanted rough board as a small animal escape ramp.
  9. Note to Applicant: Biodiversity enhancements have been recommended. Built in bat and swift nest bricks/boxes are preferred. Swift boxes can be used by other species if swifts are not using them. Bee bricks, log and brushwood piles and planting native species which produce fruit and seeds for pollinators are also recommended. Biodiversity enhancements have been recommended. A bat brick/box and a swift brick/nest box may be appropriate to build into the extensions. Built in boxes do not require maintenance and cannot fall off. The Bat Conservation Trust recommends installing a bat brick/box at least 4m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm
  10. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  11. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.