Council planning record

Demolition of existing conservatory to create single storey front, rear and side extension and alterations to the fenestration

30 HORTON WAY, BISHOPSTOKE, EASTLEIGH, SO50 8LU

Decided PermitReference: H/23/96109Eastleigh Borough Council

Last published check: 2 Oct 2026, 18:15. Check the council record for more recent changes.

Application location

30 HORTON WAY, BISHOPSTOKE, EASTLEIGH, SO50 8LU

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
2 Oct 2023
Validated
2 Oct 2023
Determination deadline
27 Nov 2023
Local authority
Eastleigh Borough Council

Application overview

Demolition of existing conservatory to create single storey front, rear and side extension and alterations to the fenestration

Proposal details

Reference
H/23/96109
Alternative references
12499069
Ward
Bishopstoke Ward
Parish
Bishopstoke CP
Agent
White & Gray Architecture (Mr Steven White)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
H_23_96109 Decision notice informative leaflet - PERMIT · PDF20 Nov 2023View
Decision NoticeDecision Notice · PDF20 Nov 2023View
Officer ReportOfficer Report · PDF17 Nov 2023View
Southern Water ResponseConsultee Response · PDF25 Oct 2023View
GIS · PDF25 Oct 2023View
Ecology response for H 23 96109 30 HORTON WAY, BISHOPSTOKE,Consultee Response · PDF16 Oct 2023View
Exisiting Floor Plans, Sections and ElevationsElevations And Floor Plan · PDF2 Oct 2023View
Application FormApplication Form · PDF2 Oct 2023View
Proposed Site Layout/Block Plan and Roof PlanSite Layout Plan · PDF2 Oct 2023View
WG210 EXISTING SITE PHOTOGRAPHSSupporting Info - Photos · PDF2 Oct 2023View
Site Location PlanLocation Plan · PDF2 Oct 2023View
Existing Site Layout/Block Plan and Roof PlanSite Layout Plan · PDF2 Oct 2023View
Proposed Floor Plans, Sections and ElevationsElevations And Floor Plan · PDF2 Oct 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_96109 Decision notice informative leaflet - PERMIT Decision Notice
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: WG210 100-01 P01, WG210 100-02 P01, WG210 100-03 P01, WG210 100-04 P01 and WG210 100-05 P01. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/imworking-on-a-building-with-bats/ive-found-a-bat-during-works. Biodiversity enhancements will be required. A bat brick and a bird box may be appropriate for this building. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.wildaboutgardens.org.uk/sites/default/files/2022- 03/WAG16%20Bats%20updated%202022%20WEB.pdf - Stars of the Night guide to attract bats into your garden https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-helpbirds/nestboxes/nestboxes-for-small-birds/ https://www.hedgehogstreet.org/help-hedgehogs/hedgehog-homes/
  5. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.