Council planning record

Alterations, extension and raising of roof by 1.0m and enlarged dormers to create additional first floor accommodation and single storey side extensions

13 KINGSWAY, CHANDLER'S FORD, EASTLEIGH, SO53 2FG

Decided PermitReference: H/23/95981Eastleigh Borough Council

Last published check: 3 Oct 2026, 07:43. Check the council record for more recent changes.

Application location

13 KINGSWAY, CHANDLER'S FORD, EASTLEIGH, SO53 2FG

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
12 Sept 2023
Validated
12 Sept 2023
Determination deadline
7 Nov 2023
Local authority
Eastleigh Borough Council

Application overview

Alterations, extension and raising of roof by 1.0m and enlarged dormers to create additional first floor accommodation and single storey side extensions

Proposal details

Reference
H/23/95981
Alternative references
12452249
Ward
Chandler's Ford Ward
Parish
Chandler's Ford CP
Agent
Apple Tree Architecture (Lee Mcilveen)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
H_23_95981 PL_Final DecisionDecision Notice · PDF6 Nov 2023View
H_23_95981 Delegated Officer ReportOfficer Report · PDF6 Nov 2023View
Southern Water responseConsultation Response · PDF10 Oct 2023View
Ecology response for H 23 95981 13 KINGSWAY, CHANDLER'S FORDConsultee Response · PDF3 Oct 2023View
Trees Consultation Response - No ObjectionConsultation Response · PDF27 Sept 2023View
Existing and Proposed Front and Side ElevationsElevations Plan · PDF12 Sept 2023View
Existing and Proposed Rear and Side ElevationsElevations Plan · PDF12 Sept 2023View
Existing and Proposed Ground Floor and Location PlanPlans · PDF12 Sept 2023View
Application FormApplication Form · PDF12 Sept 2023View
Existing and Proposed First Floor Plan and Proposed Site PlanPlans · PDF12 Sept 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_95981 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: Sheet-1 REV-3, Sheet-2 REV-4, Sheet-3 REV-3 and Sheet-4 REV-2. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in the Materials Section of the application form and approved plans Sheet 3 Rev 3 and Sheet 4 Rev 2 Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. The first floor windows on the southern dormer serving the office and ensuite [as marked on the approved plan Sheet 3 Rev 3] shall be obscure glazed to Pilkingtons level 3 or equivalent with no more than a top-hung opening toplight. Once installed the windows shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
  5. Note to Applicant: It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
  6. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  7. Note to Applicant: Biodiversity enhancements have been recommended. A bat brick/box and a swift brick/nest box may be appropriate to build into the extensions. Built in boxes do not require maintenance and cannot fall off. The Bat Conservation Trust recommends installing a bat brick/box at least 4m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm
  8. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.