Council planning record

Adding 8 solar panels on South facing roof at the back of the drive (AMENDED DESCRIPTION)

FERRYSIDE COTTAGE, THE GREEN, GREEN LANE, HAMBLE-LE-RICE, SOUTHAMPTON, SO31 4JB

Decided PermitReference: H/23/95953Eastleigh Borough Council

Last published check: 3 Oct 2026, 08:56. Check the council record for more recent changes.

Application location

FERRYSIDE COTTAGE, THE GREEN, GREEN LANE, HAMBLE-LE-RICE, SOUTHAMPTON, SO31 4JB

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
7 Sept 2023
Validated
7 Sept 2023
Determination deadline
22 Nov 2023
Local authority
Eastleigh Borough Council

Application overview

Adding 8 solar panels on South facing roof at the back of the drive (AMENDED DESCRIPTION)

Proposal details

Reference
H/23/95953
Alternative references
12433343
Ward
Hamble & Netley Ward
Parish
Hamble-le-Rice CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
H_23_95953 PL_Final DecisionDecision Notice · PDF31 Oct 2023View
H_23_95953 Delegated Officer ReportOfficer Report · PDF27 Oct 2023View
H_23_95953 & L_23_94926 Parish responseConsultation Response · PDF24 Oct 2023View
Southern Water Consultation responseConsultation Response · PDF11 Oct 2023View
Ecology response amended for H 23 95953 FERRYSIDE COTTAGE, THE GREEN, GREEN LANE, HAMBLE-LE-RICEConsultee Response · PDF4 Oct 2023View
Block PlanBlock Plan · PDF7 Sept 2023View
Application FormApplication Form · PDF7 Sept 2023View
Proposed Elevation PlanElevations Plan · PDF4 Sept 2023View
Location PlanLocation Plan · PDF20 Apr 2023View
Site PlanSite Layout Plan · PDF23 Mar 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_95953 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: BLC 01, PP 01, TQRQM23061160550893 and TQRQM23108171823210 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those used on the existing building or otherwise be implemented in accordance with the following plans numbered: PP 01 Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: The solar panels are proposed to be installed under a precautionary working method statement (PWMS) between November and February to avoid risks to nesting birds and roosting and hibernating bats. If this must be done in March, then a nesting bird check must be done by a suitably qualified ecologist within 24 hours prior to installation to ensure that birds are not nesting or beginning to build nests at this site. Any active nests or nests being built must be protected from disturbance by a suitable buffer (usually 5 m) until the young have fledged and left the nest. If the work cannot be done before the end of March, then it will need to wait until the following November to avoid the risk of disturbance to bats.
  5. Note to Applicant: Once the scaffolding is installed an ecologist will inspect the area behind the tiles with an endoscope. If any evidence of bats is found, such as droppings, work will stop and a license will be sought from Natural England.
  6. Note to Applicant: In the instance no evidence of bats is recorded during the endoscope inspection the works can go ahead following the PWMS: 1) Works to be undertaken between November to March, inclusively; 2) A toolbox talk is to be undertaken to the solar panel installers prior to installation, explaining the protection afforded bats, how to identify presence of bats, and precautionary method of works that they must comply with. The PWMS is to be provided to the contractors, which will sign the document as evidence of their commitment and a copy of the PWMS will be kept on site during works; 3) A suitably qualified Ecologist will supervise the solar panel installation works. To avoid unnecessary impact on the roof it is advised that the solar panel installers use roof ladders instead of walking directly onto the tiles. Where there are points of impacts not covered by the endoscope inspection, the contractor will inform the Ecologist so that an endoscope inspection can be undertaken prior to impact.
  7. Note to Applicant: The artificial lifting of additional tiles on the southern elevation outside of the area of the solar panels will provide compensation for any potential bat roost openings in tiles covered by the solar panels.
  8. Note to Applicant: Biodiversity enhancements is required, including two swift nest boxes on the northern side of the property, a bat box on the southern elevation and night-scented climbing plants (where there is space). The solar panels will also provide additional nesting opportunities for birds. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm )
  9. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  10. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.