The development hereby permitted shall be implemented in accordance with the following plans numbered: 855/08/100 - Site Layout Plan 855/08/101 - Existing Floor Plan 855/08/102 - Existing Roof Plan 855/08/103 - Existing Elevations 855/08/104 - Proposed Floor Plans 855/08/105 - Proposed Roof Plan 855/08/106 - Proposed Floor Plans Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The materials to be used must match as closely as possible, in type, colour and texture those listed in the Materials Section of the application form and and approved plan 855/08/106 Reason: To ensure a satisfactory visual relationship of the new development to the existing.
The window serving the open plan family area on the northern elevation [as marked on the approved plan 855/08/106] shall either be obscure glazed to Pilkingtons level 3 or equivalent with no more than a top-hung opening toplight or positioned at least 1.7 metres above the floor of the room in which it is installed. Once installed the window shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
No development, including demolition, shall start on site until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority, which shall include a precautionary working method to protect toads, bats, swifts, hedgehogs and stag beetles. Construction work shall only take place in accordance with the approved CEMP. Reason: To protect wildlife species, in accordance with Policies DM1 and DM11 of the Eastleigh Borough Local Plan (2016-2036).
Note to Applicant: There is a record of bats near this property. In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
Note to Applicant: Biodiversity enhancements will be required. A bat/brick box, bird nest box, hedgehog home, stag beetle habitat and/or planting for pollinators may be appropriate for this application. The Bat Conservation Trust recommends installing a bat brick/box at least 4m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm
Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.